ELECTRICAL SYSTEM
6-31
SPECIFICATIONS
Type designation
CB4L-B, FB4L-B
Capacity
12 V, 14.4 kC (4 Ah)/10 HR
Standard electrolyte
1.280 at 20°C
(Specific gravity)
When installing the battery onto the motorcycle, connect the
breather tube to the battery vent.
INITIAL CHARGING
FILLING ELECTROLYTE
Remove the short sealed tube.
Fill the battery with electrolyte to the UPPER LEVEL line
1
.
Wait approximately a half-hour and check the electrolyte level.
If the electrolyte level has fallen, add electrolyte to the UPPER
LEVEL line
1
.
Slowly charge the battery with a battery charger at the speci-
fied current, as described below.
Maximum charging current: 0.4 A
The charging time for a new battery is determined by the num-
ber of months that have elapsed since the date of manufacture.
The manufacture’s date is indicated by the six-digit stamp
2
located on the battery. The day, month and year are each indi-
cated by two digits.
Months after manufacturing
Necessary charging hours
Within 6
20
Within 9
30
Within 12
40
Over 12
60
NOTE:
If necessary, add only distilled water to the UPPER LEVEL line.
Install the seal caps after charging.
After charging the battery, allow the battery to cool for two
hours, before installing it.
Содержание UF50
Страница 1: ...9 9 5 0 0 1 0 4 9 1 0 1 E UF50 ...
Страница 26: ...2 14 PERIODIC MAINTENANCE 1 2 3 4 5 6 7 8 6 9 0 A B C ...
Страница 104: ...5 22 CHASSIS HANDLEBAR COVERS AND SPEEDOMETER ASSEMBLY CONSTRUCTION 1 Front handlebar cover 2 Rear handlebar cover ...
Страница 162: ...SERVICING INFORMATION 7 11 ...
Страница 164: ...SERVICING INFORMATION 7 13 ...
Страница 185: ...Printed in Japan Y K1 ...