Power Assisted Steering System: 6C-40
2
1) Connect the combination meter coupler and speed
sensor coupler.
2) Turn the ignition switch ON.
3) Measure the voltage between the Bl/B wire “A” and
ground.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage (
)
Vehicle speed signal voltage
5.0 V
Is voltage OK?
Go to step 3.
Bl/B wire shorted to
ground.
3
1) Remove the engine side cover. Refer to “Rear Side
Exterior Parts Removal and Installation in Section 9D in
related manual”.
2) Inspect the speed sensor. Refer to “Speed Sensor
Inspection in Section 9C in related manual”.
Is speed sensor OK?
Replace the EPS
control unit. Refer to
“EPS Control Unit
Removal and
Installation (LT-A750XP/
ZK9) (Page 6C-48)”.
Replace the speed
sensor. Refer to “Speed
Sensor Removal and
Installation in Section
9C in related manual”.
Step
Action
Yes
No
“A”
(A)
I931G3630033-01
I931G3630034-01
Содержание LT-A750X/P
Страница 1: ...LT A750XP Z USE THIS MANUAL WITH LT A750X Z SERVICE MANUAL 99500 47021 01E 9 9 5 0 1 4 7 0 5 0 0 1 E ...
Страница 4: ......
Страница 54: ...4A 6 Brake Control System and Diagnosis ...
Страница 135: ...Prepared by March 2009 Part No 99501 47050 01E Printed in Japan 132 ...
Страница 136: ...Printed in Japan K9 ...