6C-37 Power Assisted Steering System:
2
1) Turn the ignition switch OFF.
2) Connect the torque sensor coupler.
3) Insert the needle-point probes to lead wire coupler.
4) Turn the ignition switch ON.
5) Measure the voltage between W wire “A” and B wire “B”
by turning the handlebars left and right.
Special tool
(A): 09900–25008 (Multi circuit tester set)
(B): 09900–25009 (Needle-point probe set)
Tester knob indication
Voltage (
)
Torque sensor (Sub) voltage
Handlebars is left turn: Approx. 2.0 V
Handlebars is right turn: Approx 3.0 V
Is voltage OK?
• Replace the EPS
control unit with a
known good one, and
inspect it again. Refer
to “EPS Control Unit
Removal and
Installation (LT-
A750XP/ZK9)
(Page 6C-48)”.
• R wire terminal or W
wire terminal circuit
open (torque sensor
side).
• If check result is not
satisfactory, replace
the torque sensor
(EPS body assembly)
with a new one. Refer
to “Steering Shaft
Removal and
Installation in Section
6B in related
manual”.
Step
Action
Yes
No
(B)
“A”
“B”
(A)
“C”
(B)
(B)
I931G3630030-02
I931H1630042-01
Содержание LT-A750X/P
Страница 1: ...LT A750XP Z USE THIS MANUAL WITH LT A750X Z SERVICE MANUAL 99500 47021 01E 9 9 5 0 1 4 7 0 5 0 0 1 E ...
Страница 4: ......
Страница 54: ...4A 6 Brake Control System and Diagnosis ...
Страница 135: ...Prepared by March 2009 Part No 99501 47050 01E Printed in Japan 132 ...
Страница 136: ...Printed in Japan K9 ...