3-28 ENGINE
• Install the valve spring retainer
1
, press down the spring
using the valve lifter and then install the cotter halves onto the
valve stem end. Then, release the valve lifter to allow the cot-
ters
2
to wedge between the retainer and the valve stem. Be
sure that the rounded lip
3
of the cotter fits snugly into the
groove
4
in the stem end.
&
09916-14510: Valve lifter
09916-14910: Valve lifter attachment
09916-84511: Tweezers
#
INTAKE PIPE
• When installing the intake pipe, apply grease to the O-ring.
)
99000-25030: SUZUKI SUPER GREASE “A” (USA)
99000-25010: SUZUKI SUPER GREASE “A” (Others)
#
NOTE:
Make sure that the protrusion
A
comes upward.
CAM CHAIN TENSIONER
• Install the cam chain tensioner
1
.
• Tighten the cam chain tensioner bolt to the specified torque.
"
Cam chain tensioner mounting bolt:
13 N·m (1.3 kgf-m, 9.5 lb-ft)
Be sure to install all of the parts in their original posi-
tions.
Use the new O-ring to prevent sucking air from the
joint.
Содержание DR 125
Страница 1: ...DR Z125 L 9 9 5 0 0 4 1 1 2 5 0 1 E...
Страница 34: ...PERIODIC MAINTENANCE 2 21...
Страница 167: ...SERVICING INFORMATION 7 9 WIRING DIAGRAM...
Страница 169: ...SERVICING INFORMATION 7 11 Generator lead wire 5 N m 0 5 kgf m 3 7 lb ft 55 N m 5 5 kgf m 40 lb ft 90...
Страница 173: ...SERVICING INFORMATION 7 15 55 N m 5 5 kgf m 40 0 lb ft 50 N m 5 0 kgf m 36 0 lb ft SIDE STAND SET UP...
Страница 221: ...Prepared by 6th Ed May 2008 May 2008 1st Ed March 2002 Part No 99500 41125 01E Printed in Japan 228...
Страница 222: ...Printed in Japan K3 K4 K5 K6 K7 K8...