6-9
VEHICLE LOADING AND TOWING
79K20-03E
7) Release the parking brake.
Stop towing the vehicle every 300 km (200
miles). Start the engine. With the manual
transmission lever in 2nd gear (or the auto-
matic transmission lever in “D”) and the
transfer switch in neutral, rev the engine for
about one minute with the clutch engaged
(if equipped), to circulate oil in the transfer
case.
64J148
TOWING METHOD A
FOUR WHEELS ON THE GROUND
Towing Your Vehicle (recreational towing): 13
Содержание 2009 Grand Vitara
Страница 6: ...79K20 03E MEMO...
Страница 15: ...FUEL RECOMMENDATION 1 79K20 03E 65D394 FUEL RECOMMENDATION Fuel Recommendation 1 1...
Страница 140: ...3 41 OPERATING YOUR VEHICLE 79K20 03E MEMO...
Страница 150: ...4 9 DRIVING TIPS 79K20 03E MEMO...
Страница 282: ...8 11 EMERGENCY SERVICE 79K20 03E MEMO...
Страница 283: ...APPEARANCE CARE 9 79K20 03E 60G412 APPEARANCE CARE Corrosion Prevention 9 1 Vehicle Cleaning 9 3...
Страница 288: ...9 5 APPEARANCE CARE 79K20 03E MEMO...
Страница 294: ...10 5 GENERAL INFORMATION 79K20 03E MEMO...
Страница 298: ...11 4 FUSES AND PROTECTED CIRCUITS 79K20 03E MEMO...
Страница 308: ...13 6 INDEX 79K20 03E MEMO...
Страница 309: ...79K20 03E Prepared by June 2008 Part No 99011 79K20 03E Printed in Japan TP306...