background image

Installation Procedure

1. Plan the final position of the roundabout ensuring there is enough space*. The roundabout can only be 

installed on a level site, maximum gradient 1 in 50**.

2. Excavate the foundation according to the drawings. It's important that water does not

collect beneath the roundabout, so additional drainage may be required if the ground is not free

draining.

3. The roundabout parts are very heavy, lifting equipment will be required.

4. The roundabout is supplied with the top assembly fitted to the base ring. These should be carefully 

separated by lifting the top assembly away from the base ring, keeping both parts horizontal to

prevent distortion.

5. Lift the base ring into the foundation hole. It's important that the base ring remains perfectly round so 

do not rest it on its side and ensure it is supported all round when in the foundation hole. When installed 

ensure the base ring is level in all directions

6.Fasten the lower outer rings and the upper outer rings to the base ring using the supplied M10 bolts, nuts 

and washers. Ensure the lower rings are fastned tight, leave upper rings loose for ajustment later. The top 

of the upper rings should be at play level.

7. Install the concrete foundation around the outside lower ring 200mm deep, this should bring the concrete 

to just under the upper rings.

8. Install the lower part of the centre pole. It's important that this is vertical, exactly in the centre of the ring, 

and the top surface is level with the top of the upper outer rings.

9. Do not install safety surfacing until the top assembly has been installed in case adjustment is needed.

10. When the concrete has set (2 to 3 days) the top assembly can be lowered onto the base ring. Ensure 

that both the vertical and horizontal faces of the track ring are free from debris and there is sufficient clear-

ance for the guide wheels. Take care when lowering the top assembly that it is central to prevent damage 

to the four guide wheels.

 
  

 

 

 

Description   

          

 Qty.   

Code Ref 

Base 

Ring 

   1 

 SWD052GAL

Top 

Assembly 

   1 

 SWD062

Centre 

Pole 

Assembly 

  1 

 SWD076

Lower 

Outer 

Ring 

  4 

 SWD078GAL

Upper 

Outer 

Ring 

  4 

 SWD079GAL

SWD050 Inclusive Roundabout 
Installation Instructions

Tape Measure
Spirit Level
Digging Implements
Wrench 17mm
Set of Allen Keys
Lifting equipment
Security tool FIX195

Parts List

Sheet 2 of 6  Rev 01

ve Roundabout 

ctions

v 01

SWD062

SWD052GAL

SWD076

SWD076

Required Tools

SWD078GAL

SWD079GAL

Отзывы: