Sussman ES30A Скачать руководство пользователя страница 9

ES 30A - ES36A - HP 30A Electric Steam Generator

Installation, Operation and Maintenance Manual

_____________________________________________________________________________

9

Gauge Glass Installation - Use and Care

DO NOTs

DO NOT use glass if it contains any scratches, chips, or any other visible signs of damage.
DO NOT reuse any tubular glass or glass packings.
DO NOT subject gauge glass to bending or torsional stresses.
DO NOT over tighten glass packing nuts.
DO NOT allow glass to touch any metal parts.
DO NOT exceed the recommended pressure of the gauge or gauge glass.
DO NOT clean the gauge or gauge glass while pressurized or in operation.

DO's

DO verify proper gauge has been supplied.
DO examine gauge glass and packings carefully for damage before installation.
DO install protective guards and utilize automatic ball checks where necessary to help prevent injury

in case of glass breakage.

DO inspect the gauge glass daily, keep maintenance records, and conduct routine replacements.
DO protect glass from sudden changes in temperatures such as drafts, water spray, etc.

MAINTENANCE

Examine the gauge glass regularly for any signs of clouding, scratching, erosion, or corrosion. The glass should be
inspected daily until the need for replacement becomes apparent. This will help establish the routine inspection
and routine replacement schedules.

CLEANING

Use commercial non-abrasive glass cleaners to keep glass clean. Use diluted acids such as Hydrochloric (muriatic)
acid when regular cleaners do not seem to work. Do not use wire brushes or any other abrasive materials which
could scratch the glass.

INSPECTION

Examine the surface of the glass for scratches, corrosion, chips, cracks, surface flaws, or nicks. To do this, shine a
very bright concentrated light at an angle of about 45 degrees. A defective glass will glisten as the light strikes
imperfections. Glass which appears cloudy or roughened, and will not respond to cleaning, should be replaced.

STORING

Keep gauge glass in original packaging until ready to install.

Содержание ES30A

Страница 1: ...pproving your generator It must be kept near the generator at all times KW Design Max Work Model Range Steam Rate BHP Pressure Pressure ________________________________________________________________...

Страница 2: ...automatically opens to reduce pressure should excessive steam cause pressure build up STEAM PRESSURE GAUGE Allows visual observation of steam pressure over full range ENERGY SAVING AND MINIMUM MAINTEN...

Страница 3: ...and N E C requirements following wiring diagram supplied Wire size specified adjacent to field wiring terminal block s Use 90 C copper wire only Purchaser should use a disconnect switch employing circ...

Страница 4: ...ation Operation and Maintenance Manual _____________________________________________________________________________ 4 Factory Wiring Field Wiring NOTE See Boiler Nameplate for Input Requirements Wiri...

Страница 5: ...ting pressure control to a low pressure setting Set hi limit control at 10 PS1G above that setting Switch boiler on to allow for steam pressure build up Pressure gauge reading will build and the opera...

Страница 6: ...off the boiler switch unless further operation is desirable 6 If you have been supplied with a Manual Reset Low Water Control as required in some states the reset button on the control must be pushed...

Страница 7: ...on terminals on element assembly are in line with previously disconnected wire leads to facilitate easy connections NOTE Observe markings on element flange Install element marking TOP on top 7 Use onl...

Страница 8: ...both ends of the gauge glass Push both packings about an inch up the gauge glass 4 Gently insert one end of the glass into the top gauge fitting Keeping the glass inside the top fit ting gently rotate...

Страница 9: ...e gauge glass daily keep maintenance records and conduct routine replacements DO protect glass from sudden changes in temperatures such as drafts water spray etc MAINTENANCE Examine the gauge glass re...

Страница 10: ...RE FREQUENT BLOWDOWN IS REQUIRED RECOMMENDED LIMITS WITHIN A BOILER TOTAL DISSOLVED SOLIDS ppm 3500 TOTAL ALKALINITY ppm 850 SUSPENDED SOLIDS ppm 300 SILICA Si02 ppm 125 SULFITE SO3 ppm 25 50 PHOSPHAT...

Страница 11: ...Rise ____________________________________________________ Spare Parts List ____________________________________________________ 99136 Safety Valve 100PSIG 1 2 NPT _____________________________________...

Страница 12: ...PN 100600 1 17 A Division of Sussman Automatic Corporation 43 20 34th Street Long Island City NY 11101 718 937 4500 1 800 238 3535 Fax 718 937 4676 www sussmanboilers com Email seb sussmancorp com...

Отзывы: