![Suspa ELS3-500S-BTU-Q-HeavyDuty Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/suspa/els3-500s-btu-q-heavyduty/els3-500s-btu-q-heavyduty_installation-instructions-manual_1407727036.webp)
Installation
SUSPA ELS3 HeavyDuty - Installation Instruction
Page 36
Optional: Mounting the connection set HD
The mechanical coupling of two complete 2-leg table systems is possible with an optional
connection set HD. However, in doing so, you have to note that these two 2-leg table systems also
have to be connected electrically with one another!
If more than four lifting elements are used in a Height Adjustment System, then the two electrical
controllers must be connected to the connector contacts of the electrical connector with a link
cable (Order number 198 10134). In the process, please consider the procedure described in
chapter 6.3.5 Overall Installation.
IMPORTANT
The ELS3 HeavyDuty Height Adjustment System can be supplied in different
versions. The supply variants contain 1 to 8 lifting elements. There is a different controller variant
depending on the supply variant. The correct variant of the controller can be supplied only if you
specify the supply variant at the time of placing the order.
Figure 18 Connection set of the HD 2-leg system
Place the fixing plates of the two subframes exactly next to one another and screw the two fixing
plates tightly to one another with the M8x50 screws, the M8 washers and the self-locking M8 nut
supplied. Use a size 6 Allen wrench for mounting the screws and a size SW17 open-end wrench for
the self-locking nuts.
2 x screws
M8x50
4x washers
8.4x20
2 x self-locking
nuts M8
Fixing plate
(subframe 2)
Fixing plate
(subframe 1)