SurgeX XQ515 Скачать руководство пользователя страница 20

 

20 

the feedback input. Figure 7 shows how to connect and program each unit in a three-unit system. 
Note that terminals 5 and 6 are connected together for all units except the last one. If only two 
units are to be cascaded together then ignore the middle unit in the diagram. If more than three 
units are to be cascaded together then keep the first and last units set up as shown, add units in 
the middle and set them up and connected them in the same way as the middle unit in the 
diagram. 
 
The remote control inputs should be connected to the first unit, and the same control options are 
available as for a single-unit system. If confirmation feedback is required for a central controller 
use the aux relay contacts on the last unit. 
 
The delay times should be set as required for the application. 
 
If the low and high voltage shutdown points are narrowed from their defaults of 90V and 150V 
this should be done on the first unit only. The other units should be left set to 90V and 150V.The 
two restore options should only be enabled (if required) on the first unit. The self-test shutdown 
should be the same for all units. 
 
If an over-ride is required connect it to the last unit and program that unit to accept the type of 
over-ride you need. 

 

Содержание XQ515

Страница 1: ...USER MANUAL SurgeX XQ515 Three Bank XQ515uencer With SurgeX Power Conditioning Software Version 2 0...

Страница 2: ...TROL 11 5 3 12V DC OUTPUT 11 5 4 AUXILIARY RELAY 12 5 5 FRONT PANEL PUSH BUTTON 13 5 6 OUT OF RANGE AC VOLTAGE SHUT DOWN 13 5 7 SELF TEST FAILURE SHUT DOWN 14 5 8 RESTORE FUNCTIONS 14 5 9 PASSWORD 14...

Страница 3: ...3...

Страница 4: ...The red push button when pressed causes the unit to power up or power down This button can be disabled if not required The red LED above the button indicates the status of the unit When the red LED i...

Страница 5: ...ed to force unit off or force unit on Optional password can be used to prevent unauthorized access to set up information Adjustable under voltage and over voltage shut down Optional restore after powe...

Страница 6: ...ed and also because some of the functions of the XQ515 are not available when a latching switch is used see programming section Switches with gold contacts are recommended for the best long term relia...

Страница 7: ...ve wire to over ride and the negative wire to common 3 2 3 External LED Connections The XQ515 is able to drive external LEDs or other signaling devices through its 12V dc output which can provide up t...

Страница 8: ...If you need assistance with this please contact our technical support department Connecting a 12 volt relay to the 12V dc output To use the auxiliary relay contacts for confirmation connect the conta...

Страница 9: ...ve connected an LED to the 12V dc output for remote signaling step through the menu until you reach 12V dc Output Then advance ADJ to select LED This selection will make the remote LED mimic the LED o...

Страница 10: ...the programming mode Once a password has been set you need to enter the same password before you can get back into the programming mode again This prevents unauthorized personnel from changing the se...

Страница 11: ...is required select Special Delay or if not select Use Main Delays A special delay should not be used when the Aux Relay is used to provide a forth XQ515uenced bank as the XQ515uencing between the fort...

Страница 12: ...to power on last and off first you should select C as the 12V dc Output and set this delay time to be shorter than the delay that you set for Main Bank C Off the 12V Delay Off can be set to zero in t...

Страница 13: ...ered down from the front panel There is one menu item associated with the push button which allows it to be disabled or to operate only after a one second delay The delay option prevents the unit inad...

Страница 14: ...tion Override Restore Select Enable if you want the XQ515 to power up again after being forced off by an over ride Select Disable if you don t want this function 5 9 Password A password can be set whi...

Страница 15: ...hes to be connected in parallel so that the XQ515 can be controlled from multiple locations A single push switch would cause the unit to power up on the first press and then power down on the second p...

Страница 16: ...6 1 4 Over Ride Function The XQ515 has an over ride function that can be used for fire safety and other applications where the power must be held on or forced off The over ride function is programmabl...

Страница 17: ...eing forced off by an over ride See section 5 8 for more details 6 2 Single Unit System Most of the information necessary to install and set up a single unit system can be found in sections 3 2 and 6...

Страница 18: ...xample the turn on delay for Bank C is 5 seconds and the turn on delay for the SX1120 RT is 10 seconds Because the Aux Output is set to Bank C the same internal trigger is used to start both time dela...

Страница 19: ...how to connect and program each unit in a three unit system If only two units are to be ganged together then ignore the middle unit in the diagram If more than three units are to be ganged together t...

Страница 20: ...uld be connected to the first unit and the same control options are available as for a single unit system If confirmation feedback is required for a central controller use the aux relay contacts on th...

Страница 21: ...Q515 Single Unit System Controlled by Momentary Switches Location 3 Location 2 Location 1 Mixer Signal Processing Amplifier Use an LED and 1K W resistor at each location Program Up Down Inputs Momenta...

Страница 22: ...4 5 6 7 XQ515 Mixer Signal Processing Amplifier Single Unit System Controlled by Central Controller Program Up Down Inputs Latching Aux Output Confirm Confirmation Feedback Controller Low Voltage Cont...

Страница 23: ...5 6 7 XQ515 A On Switched 1 2 3 4 5 6 7 SX1120 RT LED and 1K 1 4W Resistor Confirmation If Required Program Up Down Inputs Momentary 12v dc Output LED Aux Output A B or C Aux Delay On Set as Needed A...

Страница 24: ...C B A 1 2 3 4 5 6 7 XQ515 A On Switched 1 2 3 4 5 6 7 SX1120 RT Confirmation If Required Program Up Down Inputs Momentary 12v dc Output A B or C 12V Delay On Set as Needed 12V Delay Off Set as Needed...

Страница 25: ...utput to be the first bank in the XQ515uence The equipment rack will then turn on first and off last Connect pins 6 7 of the XQ515 to pins 1 2 of the first SX1120RT as per Figure 3 Then connect pins 6...

Страница 26: ...1 2 3 4 5 6 7 XQ515 A ON C B A 1 2 3 4 5 6 7 XQ515 Program Up Down Inputs One Mom 12V dc Output LED Aux Output Gang Confirmation If Required Program Up Down Inputs Latching Aux Output Gang Program Up...

Страница 27: ...ed LED and 1K 1 4W Resistor Program Up Down Inputs One Mom Over Ride Input 5 30 Vdc Over Ride Func Master 12V dc Output LED Aux Output Cascade Program Up Down Inputs Latching Over Ride Input 5 30 Vdc...

Страница 28: ...inal 2 is being held active all the time Remove the terminal block from the rear and check that the Up and Down signals are correct with a meter The front panel button will not work Check whether the...

Страница 29: ...he calibration of the AC voltmeter is no longer accurate The unit is otherwise fully operational Call the factory for assistance Error 15 There is a checksum error in the non volatile memory This indi...

Страница 30: ...to current limiting Maximum Applied Surge Energy Unlimited due to current limiting Endurance C62 41 1991 category B3 pulses 1 KV 500 000 3 KV 10 000 6 KV 1000 Number of Outlets 14 Number of Banks 3 De...

Отзывы: