
Installation and Instructions
13
Electrical Junction Box
Wiring should be connected at a customer
provided junction box, outside the firebox.
Electrical Services
If an electrical supply of 120V is being roughed in
to the fireplace junction box to provide for future
installation of the optional blower kit, the wiring should
be connected to the internal junction box.
NOTE: A FEW BASIC SAFETY RULES BEFORE
YOU START
1. All electrical connections (Fig. 12) are to be made
in accordance with CSA Standard C22.1 Canadian
Electrical Code part 1 or with the National
Electrical Code, ANSI/NFPA 70 (latest edition)
and/or in accordance with local codes.
2. Make sure you have and are using/wearing proper
personal safety devices such as but not limited to
gloves, safety eye glasses/eye protection .
3. Check local building codes before installation of the
firebox and blower kit.
4. All wiring must be installed and/or inspected as
necessary to comply with the local authority
having jurisdiction.
Junction Box Wiring
1. Remove (2) J-box retaining screws. (See Fig. 14)
2. Remove J-Box Assembly from Fireplace
(See Fig. 15)
3. Remove Receptacle Cover & Receptacle
4. Attach household 110 VAC supply wire to
Receptacle.
5. Tighten Cable Clamp, re-install Receptacle and
Cover
6. Re-install J-box Assembly into Fireplace
M
FIREBOX ENCLOSURE
INSTALLER:
WIRE INTERNAL RECEPTACLE
TO 110VAC HOUSE WIRING
PER APPLICABLE LOCAL CODES
BLOWER MOTOR ACCESSORY
SPST BLOWER SWITCH
STEEL HANDI-BOX
W/SINGLE GANG
RECEPTACLE
VFBC WIRING DIAGRAM - ALL SIZES -
Fig. 12
Fig. 13
Fig. 14
Fig 15.