Chapter 5: Advanced Serverboard Setup
5-5
1. There are two levers on the
LGA2011 socket. First press and
release the load lever labeled
'Open 1st'.
2. Press the second load lever
labeled 'Close 1st' to release the
load plate from its locked position.
Installing an LGA2011 Processor
5-5 Installing the Processor and Heatsink
Warning:
When handling the processor package, avoid placing direct pressure on the
label area of the fan.
Notes:
•
Always connect the power cord last and always remove it before adding, re-
moving or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
•
If you buy a CPU separately, make sure that you use an Intel-certifi ed multi-
directional heatsink only.
•
Make sure to install the serverboard into the chassis before you install the CPU
heatsinks.
•
When receiving a serverboard without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
•
Refer to the Supermicro web site for updates on CPU support.
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
Press down on the lever labeled
'Close 1st'
Pull lever away
from the socket
Содержание SuperServer 6027R-3RF4+
Страница 1: ...SUPERSERVER 6027R 3RF4 SUPER USER S MANUAL 1 0b...
Страница 5: ...Notes Preface v...
Страница 14: ...1 6 SUPERSERVER 6027R 3RF4 User s Manual Notes...
Страница 22: ...2 8 SUPERSERVER 6027R 3RF4 User s Manual Notes...
Страница 26: ...SUPERSERVER 6027R 3RF4 User s Manual 3 4 Notes...
Страница 46: ...4 20 SUPERSERVER 6027R 3RF4 User s Manual Notes...
Страница 86: ...6 8 SUPERSERVER 6027R 3RF4 User s Manual Notes...
Страница 118: ...A 2 SUPERSERVER 6027R 3RF4 User s Manual Notes...
Страница 121: ...B 3 Appendix B System Specifications Notes...