2-11
Figure 2-8. Cable Managment Arm and Velcro Straps
Figure 2-9. Installing the Connectors 1 and 2
2-5 Installing the Cable Management Arm
The SC226S chassis supports a cable management arm (CMA) that allows servicing
while the server is running. The CMA keeps the rear cables organized and clear of
the rail mechanisms when the system is extended out the front of the rack. The kit
includes six fabric Velcro cable ties.
The CMA attaches to the rack mounting rails by means of four connectors. They
are labled on the connectors 1, 2, 3, and 4.
Installing the Cable Management Arm
1. Slide CMA connector #1 forward onto the two posts on the rear of the right inner
rail (right side when viewed from the front). It snaps into place.
2. Slide CMA connector #2 forward onto the two posts on the rear of the right
middle rail. It snaps into place.
1
2
1
1
Note:
Example only--your
chassis will look different.
Содержание SuperStorage Server 2028R-NR48N
Страница 1: ...USER S MANUAL Revision 1 0 SuperStorage Server 2028R NR48N...
Страница 8: ...viii SuperStorage Server 2028R NR48N Notes...
Страница 14: ...1 6 SuperStorage Server 2028R NR48N Notes...
Страница 28: ...SuperStorage Server 2028R NR48N 2 14 Notes...
Страница 34: ...SuperStorage Server 2028R NR48N 3 6 Notes...
Страница 54: ...4 20 SuperStorage Server 2028R NR48N Notes...
Страница 82: ...5 28 SuperStorage Server 2028R NR48N Notes...
Страница 94: ...SuperStorage Server 2028R NR48N 6 12 Figure 6 14 Placing the System Fan...
Страница 138: ...SuperStorage Server 2028R NR48N A 2 Notes...