6-2
S
UPER
S
ERVER 6014L-M4 User's Manual
Figure 6-2. Chassis Rear View
6-2 Control
Panel
The control panel (located on the front of the chassis) must be connected to the
JF1 connector on the serverboard to provide you with system control buttons and
status indicators. These wires have been bundled together in a ribbon cable to
simplify the connection. Connect the cable from JF1 on the serverboard to JP4 on
the Control Panel PCB (printed circuit board). Make sure the red wire plugs into
pin 1 on both JF1 and JP4. Pull all excess cabling out of the airfl ow path. The
LEDs inform you of system status. See Chapter 3 for details on the LEDs and the
control panel buttons. Details on JF1 can be found in Chapter 5.
Figure 6-1. Chassis Front View
Содержание SUPERSERVER 6014L-M4
Страница 1: ...SUPER SUPERSERVER 6014L M4 USER S MANUAL Revision 1 0...
Страница 5: ...v Preface Notes...
Страница 10: ...x Notes SUPERSERVER 6014L M4 User s Manual...
Страница 18: ...1 8 SUPERSERVER 6014L M4 User s Manual Notes...
Страница 27: ...Chapter 2 Server Installation 2 9 Figure 2 4 Accessing the Inside of the SuperServer 6014L M4...
Страница 32: ...3 4 SUPERSERVER 6014L M4 User s Manual Notes...
Страница 62: ...5 26 SUPERSERVER 6014L M4 User s Manual Notes...
Страница 70: ...6 8 SUPERSERVER 6014L M4 User s Manual Notes...
Страница 100: ...B 8 SUPERSERVER 6014L M4 User s Manual Notes...
Страница 106: ...C 6 SUPERSERVER 6014L M4 User s Manual...
Страница 120: ...C 20 SUPERSERVER 6014L M4 User s Manual Notes...