![Supermicro SuperBlade SBI-6119R-C3N Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/supermicro/superblade-sbi-6119r-c3n/superblade-sbi-6119r-c3n_user-manual_1404449017.webp)
Chapter 2: Server Installation
17
OPEN 1st
7. With the CPU inside the socket, inspect the four corners of the CPU to make sure that
the CPU is properly installed.
8. Close the load plate with the CPU inside the socket. Lock the lever labeled 'Close 1st'
first, then lock the lever labeled 'Open 1st' second. Use your thumb to gently push the
load levers down to the lever locks.
OPEN 1st
Push down and lock the
level labeled 'Close 1st'.
Gently close
the load plate.
OPEN 1st
Lever Lock
Lever Lock
Push down and
lock the lever
labeled 'Open 1st'