4-1
Chapter 4: Chassis Setup and Maintenance
Chapter 4
Chassis Setup and Maintenance
4-1 Overview
This chapter covers the steps required to install components and perform
maintenance on the chassis. The only tool required is a Phillips screwdriver.
Review the warnings and precautions listed in the manual before setting up or
servicing this chassis. These include information in Chapter 2:
Warning Statements
for AC Systems
and the warning/precautions listed in the setup instructions.
Figure 4-1. Front View
Figure 4-2. Rear View
(E2C model shown)
BMC
LAN
SAS
Control Panel
Содержание CSE-847E1C-R1K23JBOD
Страница 30: ...2 20 SC847 JBOD Chassis Manual Notes...
Страница 46: ...SC847 JBOD Chassis Manual 4 12 Figure 4 13 Placing a Mid chassis Fan...
Страница 48: ...SC847 JBOD Chassis Manual 4 14 Figure 4 15 Power Supply Release Tab Release Tab...
Страница 54: ...SC847 JBOD Chassis Manual 4 20 Notes...
Страница 74: ...6 10 SC847 JBOD Chassis Manual Notes...
Страница 76: ...SC847 JBOD Chassis Manual A 2...
Страница 106: ...D 10 SC847E1C 2C JBOD Chassis Manual Notes...