A+ Server AS -1114S-WTRT User's Manual
26
4. Remove the external cap from the rail Frame by pulling it upwards through the rail
guides on the rail frame. Remove the PnP cover cap.
External Cap
5. The CPU package is shipped from the factory with the green carrier frame pre-
assembled. Grip the handle of the carrier frame/CPU package assembly from its
shipping tray, and while gripping the handle, align the flanges of the carrier frame onto
the rails of the rail frame so its pins will be at the bottom when the rail frame is lowered
later.
6. Slide the carrier frame/CPU package downwards to the bottom of the rail frame. Ensure
the flanges are secure on the rails as you lower it downwards.
Carrier Frame/
CPU Package
PnP Cover Cap
Figure 3-5. Removing the External Cap
Figure 3-6. Inserting the Carrier Frame/CPU Package