Superior UVF-36 and Скачать руководство пользователя страница 9

NOTE: DIAGRAMS & ILLUSTRATION ARE NOT TO SCALE.

Figure 7

8d Nail

Top Spacer

9

The fi rebox may be positioned and then the 
framing built around it, or the framing may 
be constructed and the fi rebox positioned into 
the opening.

Usually, no special fl oor support is needed for 
the fi rebox, however, to be certain:

1.

 Estimate the total weight of the fi rebox 

system and surround materials such as 
marble, brick, stone, etc., to be installed 
(see 

Product Referance Table

 on 

Page 10 

for appliance weight).

2.

 Measure the square footage of the fl oor 

space to be occupied by the system and 
surrounds.

3.

 Note the fl oor construction, i.e. 2" x 6", 2" x 

8" or 2" x 10", single or double joists, type 
and thickness of fl oor boards.

4.

 Use this information and consult your lo-

cal building code to determine if you need 
additional support.

If you plan to raise the fi rebox, build the plat-
form assembly then position fi rebox on top. 
Secure the platform to the fl oor to prevent 
possible shifting.

Firebox Installation

Step 1.  

Frame these appliances as illustrated in 

Figures 9 through 11

.  

All framing details must 

allow for a minimum clearance to combustible 
framing members as shown in 

Figures 2 

through 6

.   Also refer to appliance specifi cations 

on 

Page 10 

. Headers may be in direct contact 

with the appliance top spacers but must not 
be supported by them or notched to fi t around 
them.  All construction above the appliance must 
be self supporting,  

DO NOT

 

USE THE APPLI-

ANCE FOR STRUCTURAL SUPPORT. 

Note:

 The framed depth from a framed wall, 

must always be measured from a fi nished 
surface.  If a wall covering such as drywall is 
to be attached to the rear wall, then the depth 
must be measured from the drywall surface.  It 
is important that this dimension be exact.

Step 2.

 Level the fi rebox by checking the top 

edge of the fi rebox. Shim if necessary.

Step 3.

 Fireplace should be secured to side 

framing members using the full length nailing 
tabs at the top and bottom of the fi replace front 
face.  Use 8d nails (

see 

Figure 7

).

Firebox Framing

Construct fi rebox framing following 

Figures 

9  through 11

  and 

 Table 1

 on 

Page 11

  for 

your specifi c installation requirements. Refer to 

Figure 8

 on 

Page 10

 for fi rebox dimensions.

The fi rebox may be installed directly on a 
combustible fl oor or raised on a platform of 
an appropriate

 

height. Do not place fi rebox on 

carpeting, vinyl or other soft fl oor coverings. It 
may, however, be placed on fl at wood, plywood, 
particle board, metal or other hard surfaces 
which extend the full width and depth of the 
enclosure.  Be sure fi rebox rests on a solid 
continuous fl oor or platform with appropriate 
framing for support and so that no cold air can 
enter room from under the fi rebox.

Note:

 The nailing fl ange and the area directly 

behind the nailing fl ange is exempt from the 
clearances described on the fi rebox clearance 
label.

Step 4.

 To safely operate the heater with con-

sideration of the mantel clearances the canopy 
must be installed (Model UVF-36 Only).

       

CAUTION

Do not block the heat-circulating 
air inlets and outlets on these 
fi reboxes. Doing so may create a 
potential fi re hazard.

       

IMPORTANT

Under no circumstances shall the 
fi rebox top spacers be removed 
or modifi ed (see 

Figure 8)

. The 

header may be in direct contact 
with the top spacers but must not 
be supported by them or notched to 
fi t around them.

Содержание UVF-36 and

Страница 1: ...N AND OPERATING INSTRUCTIONS UVF 36 UVFRC 3628 UVFRC 3628 H UVFRC 4228 UVFRC 4228 H WARNING DO NOT ATTEMPT TO BURN SOLID WOOD FUELS OTHER GAS LOG SETS OR ANY OTHER COMBUSTIBLE MATERIALS IN THIS VENT F...

Страница 2: ...ed and or closed prior to operating the heater Installation and repair should be done by a qualified service person The heater should be inspected before use and at least annually by a professional se...

Страница 3: ...on Page 12 Firebox Finishes Page 15 Accessories components Page 15 Replacement Parts List Page 17 This installation manual will help you obtain a safe efficient dependable installation for your applia...

Страница 4: ..._________ BTU Hr max the space can support _________ BTU Hr actual amount of BTU Hr used Example 61 440 BTU Hr max the space can support 66 000 BTU Hr actual amount of BTU Hr used The space in the abo...

Страница 5: ...ained In no case shall the clearances be such as to interfere with combustion air and accessibility d Installations shall be of a permanent type with a permanently piped fuel supply in accordance with...

Страница 6: ...ove Appliance all models Figure 3 CAUTION Do not install in the vicinity where gasolineorotherflammableliquids may be stored The Vent Free fire boxmustbekeptclearandfreefrom these combustible material...

Страница 7: ...s UVFRC 3628 and UVFRC 4228 WITH Canopy Installed Canopy is optional on these models 16 9 1 2 2 3 4 5 6 10 11 12 13 14 15 Top of Firebox Opening Screen Top of Appliance Combustible Mantel and Trim Hea...

Страница 8: ...ver and might require a different sequence Step 1 Position firebox prior to framing or into prepared framing Step 2 Field wire the main power supply to the appliance if a blower kit is to be installed...

Страница 9: ...If a wall covering such as drywall is to be attached to the rear wall then the depth must be measured from the drywall surface It is important that this dimension be exact Step 2 Level the firebox by...

Страница 10: ...0 lbs 26 Cu Ft H1956 UVFRC 4228 H 230 lbs 26 Cu Ft A canopy comes standard and is required for model UVF 36 The fac tory supplied canopy must be installed on the firebox for safe operation for model U...

Страница 11: ...re 13 Install three screws as shown in Figure 13 Make sure canopy is level and secure Step 3 Reinstall screen and rod assemblies see Figure 12 Framing Dimensions Opening UVF 36 UVFRC 3628 UVFRC 3628 H...

Страница 12: ...Green Wall mounted ON OFF Blower Switch or Variable Speed Control Switch Ground HOT SIDE OF RECEPTACLE An ON OFF Wall Switch is used with the FBK 100 kit field provided or sold separately order P N 8...

Страница 13: ...4 Locate the tabs shown in Figure 23 Position the blower assembly so that the tabs located on the cabinet base are seated in the notches of the blower bracket Bend the tabs over to secure the blower...

Страница 14: ...ake up slack Firebox floor Model UVFRC 4228 Shown Model UVFRC 4228 Locating Tabs Bend Locating Tabs Over into notches Use screw provided and secure in place as shown The notched side of cover plates g...

Страница 15: ...rm SIDE VIEW Firebox Floor Combustible Wall Figure 26 Raised Hearth Extension Non Combustible Wall see Figure 4 Fireplace Opening From Base to Bottom of Firebox Opening floor 5 3 4 Max Base APPROVED A...

Страница 16: ...Switch Kit shown below ON OFF Wall Switch Kit The ON OFF wall switch kit may be used to control the blower operation if FBK 100 blower kit is installed Install the ON OFF wall switch in a convenient l...

Страница 17: ...of the firebox with numbered parts and a replacement parts list can be found on the Page Normally all parts should be ordered through your distributor or dealer Parts will be shipped at prevailing pri...

Страница 18: ...NOTE DIAGRAMS ILLUSTRATION ARE NOT TO SCALE 18 NOTES...

Страница 19: ...NOTE DIAGRAMS ILLUSTRATION ARE NOT TO SCALE 19 NOTES...

Страница 20: ...est Taft Avenue Orange CA 92865 The manufacturer reserves the right to make changes at any time without notice in design materials specifications prices and also to discontinue colors styles and produ...

Отзывы: