
6
IN-LK-P-RZRS-6
Slide Boot over Ball and Socket
and onto Rack and Pinion
install Jam Nut
Shaft
- Install Ball and Socket to Rack and Pinion. Use Loctite.
- Remove, and keep, Jam Nut from Ball and Socket.
- Install Boot. Use a lubricant to ease installation.
- Reinstall Jam Nut and install Shaft to Ball and Socket.
- Secure Rubber Boot with Wire Ties.
- Install supplied Tie Rod End to Tie Rod Shaft.
- Repeat steps for opposite side.
Tie Rod Installation
(Rack and Pinion shown off machine for clarity)
Jam Nut
To Spindle
Jam Nut
Boot
Ball and Socket
Shaft
Tie Rod End
Rack and Pinion
remove Jam Nut
use Loctite here
Ball and Socket
install to bottoms
of Spindles