Sunways STH-10K-HT Скачать руководство пользователя страница 3

4

5

1.Preface

1.1 Overview

This manual is an integral part of Sunways STH 4-12kW series three-phase high-voltage 
hybrid inverters (hereinafter referred to as the hybrid inverters). It mainly introduces the 
assembly, installation, electrical connection, debugging, maintenance and troubleshooting of 
the products. Before installing and using hybrid inverters, please read this manual carefully, 
understand the safety information and be familiar with the functions and characteristics of 
hybrid inverters.

1.2 Target Groups

This manual is applicable to the electrical installers with professional qualifications and 
the people who bought it. If there are any problems in the installation process,  please call 
Sunways service telephone at +86 400-9922-958 or email Sunways at service@sunways-tech.
com for consultation.

2.Safety Instructions

2.1 Safety Notes

2.1.1 Before installation, you should read this manual carefully and follow the instructions in 
this manual strictly. 
2.1.2 Installation operators need to undergo professional training or obtain electrical related 
professional qualification certificates. 
2.1.3 During the installation, do not touch any parts of the inner part of the inverter except the
terminals. 
2.1.4 All electrical installations must conform to local electrical safety standards. 
2.1.5 If the inverter needs maintenance, please contact the local designated personnel for 
system installation and maintenance. 
2.1.6 To use this grid-connected inverter for power generation needs the permission of the 
local power supply authority. 
2.1.7 During the operation of the inverter, the surface temperature may be higher and there is 
a risk of burns. Do not touch. 
2.1.8 When installing photovoltaic panels in the daytime, the photovoltaic panels should be 
covered with opaque materials to avoid the risks and danger of high voltage at the panel end 
in sunlight.
2.1.9 When wiring the lithium battery terminals, please disconnect the breaker or switch of the 
lithium battery in case of a physical injury caused by the high-voltage.

  

Attention

The products, services or features you purchase are subject to the commercial 
contracts and terms of Ningbo Sunways technologies Co., Ltd. All or part of the 
products, services or features described in this document may not be within your 
purchasing or using scope. Unless otherwise agreed in the contract, the Company 
shall not make any express or implied declaration or guarantee of the contents of this 
document.

Due to product version upgrades or other reasons, the contents of this document will 
be updated periodically. Unless otherwise agreed, this document serves only as a 
guide to use, and all statements, information and recommendations in this document 
do not constitute any express or implied guarantee.

Manufacturer:

 

Ningbo Sunways technologies Co., Ltd.

Address: 

No. 1, Second Road, Green Industrial Zone, Chongshou Town, 

                   Cixi City, ZheJiang Province, PEOPLE’S REPUBLIC OF CHINA

Website: 

www.sunways-tech.com

Service Mail: 

[email protected]

Hotline: 

+86 400-9922-958

Содержание STH-10K-HT

Страница 1: ...1 Three phase High voltage Hybrid Inverter STH 4K 5K 6K 8K 10K 12KTL HT User Manual Ningbo Sunways Technologies Co Ltd...

Страница 2: ...e 16 3 4 Packing List 17 4 Product Installation 18 4 1 Selection of Installation Location 18 4 2 Mounting the Inverter 19 4 3 Electrical Connection 21 4 4 Communication Connection 34 4 5 Monitoring De...

Страница 3: ...n and maintenance 2 1 6 To use this grid connected inverter for power generation needs the permission of the local power supply authority 2 1 7 During the operation of the inverter the surface tempera...

Страница 4: ...e symbols displayed on the hybrid inverter nameplate and packing box 2 4 1 Symbols on the Hybrid Inverter Description Symbol Grid status indicator 2 4 2 Symbol on the Inverter nameplate The inverter c...

Страница 5: ...d below STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT 3 1 3 Applicable grid type The applicable grid types of the Sunways STH 4 12kW series are TN S TN C TN C S and TT When...

Страница 6: ...in in if the battery is not enough Mode 2 In this working mode set the Pmax from grid in the App can realize the Peak Load Shifting When the loads consumption less than the Pmax loads are supplied by...

Страница 7: ...ge the battery in the predetermined period Inverter will use power from PV and battery to supply loads in the predetermined period and the insufficient part will be supplied by the grid No Grid No Gri...

Страница 8: ...ure 3 4 410mm 175mm Name Plate Logo Display 550mm 410mm Figure 3 5 Bottom view Figure 3 6 Inverter back view 3 2 3 Inverter bottom view as shown in Figure 3 5 3 2 4 Inverter back view as shown in Figu...

Страница 9: ...the display Red An alarm or fault is detected view the fault info on the display 5 Display On Display the inverter operation information Off Display off to save power press the button to wake up the d...

Страница 10: ...ectly to strong sunlight to prevent the power derating due to excessive temperature 4 The inverter should be installed in a place with shelter to prevent direct exposure to sunlight and rain 5 Install...

Страница 11: ...ning 4 3 Electrical Connection Danger hint A high voltage in the conductive part of the inverter may cause an electric shock When performing any installation on the inverter make sure that the AC and...

Страница 12: ...2 L1 CT C CT B CT A PV Strings Battery To Battery To Sunways Meter Power Meter Sunways Meter AC Breacker AC Breacker AC Breacker AC Breacker AC Breacker 1 phase Loads 3 phase Loads Loads FN Set Run Ac...

Страница 13: ...stem all inverters PE wire need to be connected to the same grounding copper bar to ensure equipotential bonding 4 3 2 External ground connection Ground terminal connection steps 1 The external ground...

Страница 14: ...o the corresponding positive and negative connectors pull back the cable to ensure that the terminal is tightly attached in the connector 6 Use an open end wrench to screw the nut to the end to ensure...

Страница 15: ...ered when making AC output connection 1 An independent AC breaker is required in both inverter on grid and back up output side and any loads cannot be connected with inverter directly 2 Before making...

Страница 16: ...ence as shown in Figure 4 23 Strip Length 8mm 40 60mm Wire Diameter 12 18mm Cables Screw cap The insulator AC sheet cover BACK UP ON GRID Single hole seal ring Figure 4 25 Figure 4 26 Figure 4 24 3 Pu...

Страница 17: ...S1 10 L3 S2 12 L Power supplied from 220V grid 13 N RS485 RS485 Communicate with inverter CT installation direction and phase sequence should strictly follow the instruction in the user manual otherw...

Страница 18: ...on bus interface EMS EMS power dispatching interface RLYOUT Dry contact output a group of normally open contact passive dry contact PARCAN EMS RLYOUT 4 4 2 Communication between inverter and meter The...

Страница 19: ...ake sure the battery you selected is in the battery approval list of Sunways otherwise the system may not work properly Please contact your installer or Sunways service team for confirmation if you re...

Страница 20: ...the installation represents that the assembly is in place 5 Start and Stop 5 1 Start Inverter When starting the inverter follow these steps 1 Turn the DC switch in the inverter bottom to the ON positi...

Страница 21: ...te and Local before starting the auto test Remote is set as 1 by default which only can be modified to 0 by sending an external command and Local is set as 0 by default which can be modified to 1 thro...

Страница 22: ...e installer or manufacture SPI Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture E2 Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture GFCI Dev...

Страница 23: ...5 Voltage Harmonic Distortion 3 LinearLoad Model STH 4KTL HT STH 5KTL HT STH 6KTL HT STH 8KTL HT STH 10KTL HT STH 12KTL HT Efficiency Max Efficiency 98 1 98 1 98 1 98 2 98 2 98 2 European Efficiency 9...

Страница 24: ...V1 01 EN Address No 1 Second Road Green Industrial Zone Chongshou Town Cixi City ZheJiang Province PEOPLE S REPUBLIC OF CHINA Website www sunways tech com Service Mail service sunways tech com Hotline...

Отзывы: