4 Commissioning
32
Commissioning the master
1. The commissioning process starts with setting of
the display language. Select required language
with
/
.
Confirm selected language with
.
2. Select the country
/
.
Confirm the country of installation.
Your Solar Inverter will only start feeding electricity
once the country of installation has been confirmed.
3. Select «Master» with
/
.
Confirm with
.
The other devices in the CAN network are automati-
cally configured as slaves.
4. Set the data and time centrally for all connected
devices.
Please proceed with caution for time settings, as
they directly affect data logging. For example, if you
set the time back by 1 hour, then the existing data
for the last hour will be overwritten.
Select date with
. Change selected number
with
/
and jump to next number with
/
.
Save the set date with
then set the time
accordingly.
Save the set time with
.
5. Start the device search from the main unit.
The IDs for the secondary units can be allocated
automatically or manually. When manual ID
allocation is selected the ID must be requested at
the secondary unit. With automatic ID allocation
this step is not required, since the device IDs are
assigned automatically.
The following display appears during the device
search: