background image

Version  20120701

Version  20120701

Electrical Installation

General installation

• 

Any hardware used must be compatible with the mounting structure material to 

avoid galvanic corrosion.

• 

It is not recommended to use modules with different configurations (grounding, 

wiring) in the same system.

• 

Excessive cables must be organized or fixed in an adequate way, e.g. attached to 

the mounting structure by using non-metallic cable ties.

 

Solar connectors should not 

be exposed to water exposure and water submersion.

• 

For applications requiring high operating voltage several modules can be 

connected in series to form a string of modules; the system voltage is then equal to the 
sum of the voltage of each module.

• 

For applications requiring high operating currents several strings of modules can 

be connected in parallel; the system current is then equal to the sum of the current of 
each string of modules.

• 

The maximum system voltage is 600 volts DC according to UL standards. However 

products are rated for use up to 1000V where UL standards do not apply. (UL Only)

• 

The maximum number of series connected modules depends on system design, 

the type of inverter used and environmental conditions.

• 

Based on the maximum series fuse rating of module and local electrical installation 

code, always make sure Suntech PV modules with more than three strings in parallel 
for connection need to be assembled with the appropriate string fuse for circuit 
protection. 

• 

There is no limitation on the number of modules that can be connected in parallel, 

the number of modules is determined by system design parameters such as current or 
power output.

• 

To prevent the cables and the connectors from overheating, the cross section of 

the cables and the capacity of the connectors must be selected to suit the maximum 
system short circuit current. The recommended cable is PV wire with a cross section of 
at least 4mm

2

No.10

The loads of 2400 Pa, 3800 Pa and 5400 Pa are under IEC standard. The installation 

methods applicable for 5400 Pa are also relevant for 3800 Pa and 2400 Pa. The installation 
methods applicable for 3800 Pa are also relevant for 2400 Pa. 

**    

The module clamps must not come into contact with the front glass or deform the 

frame in any way. Avoid shading effects from the module clamps and insertion systems. 
Drainage holes in the module frame must not be closed or obscured by the clamps. 

***    

 Measurement A stands for the distance from the module edge to the clamping zone. 

Measurement A is 108 mm for W series 50mm thickness,  180mm for W series 35mm 
thickness, 127 mm for V series 50mm thickness (including Vdx) and 280mm for V series 
40mm thickness. The clamping zone defines the range for the middle point of the clamp.

Suntech Wdl (Made in Korea) module

No.11

No.10

2400 Pa Load *

2400 Pa Wind Load

2400 Pa Snow Load

5400 Pa Load *

5400 Pa Snow Load

2400 Pa Wind Load

5400 Pa Load * 

5400 Pa Snow Load

3800 Pa Wind Load

M

oun

ting 

sy

st

em

Use four mounting holes

Clamping sy

st

em 

**

A

ttachmen

t t

o the long fr

ame

Lengt

h

Use four clamps

Use four clamps

Use six clamps 

Clamping sy

st

em 

**

A

ttachmen

t t

o the shor

t fr

ame

Widt

h

Use four clamps on short frame

Widt

h

       

Long Frame Centre±150mm

       

Long Frame Centre±150mm

Use four clamps on the short frame and 

two clamps at the center of each long frame

Inser

tion S

yst

em

 

 Insertion system

 

 Insertion system

Use insertion system on short frame

 

 Insertion system

 

 Insertion system

Use insertion system on a 

short frame and two

clamps at the center of

each long frame

Inse
rt

ion system

Inse
rt

ion system

Use an insertion 

system on a long 

frame

Clamping Zone

From Module Edge to

1/4 Length ± 50mm 

Clamping Zone

(200mm) 

Clamping Zone

Clamping Zone

Clamping Zone

From Module Edge to

1/4 Width ± 50mm 

Clamping Zone

From Module Edge to

1/4 Width ± 50mm 

Clamping Zone

(100mm) 

Clamping Zone

(100mm) 

200mm 

200mm 

200mm 

200mm 

Содержание PLTUO245-Wde

Страница 1: ...ww suntech power com Wuxi Suntech Power Co Ltd Address Changjiang South Road New District Wuxi China 214028 Customer Service Hot Line 86 400 8888 009 Fax 86 510 8534 3321 E mail services suntech power com Or please contact our local representatives details at www suntech power com ...

Страница 2: ...safety Handling safety Installation safety Fire safety 4 Product Identification 5 Mechanical Installation Selecting the location General installation Installation method Attachment guidelines 10 Electrical Installation General installation Grounding 12 Maintenance No 1 ...

Страница 3: ...s of Isc Voc and Pmax under standard test conditions irradiance of 1000 W m AM 1 5 spectrum and a cell temperature of 25 C 77 F Only use equipment connectors wiring and support frames suitable for solar electric systems Purpose of this guide Handling safety Do not lift the module by grasping the module s junction box or electrical leads Do not sit stand step or walk on any side of the module Do no...

Страница 4: ...ll void the warranty Fire Safety Consult your local authority for guidelines and requirements for building or structural fire safety Roof constructions and installations may affect the fire safety of a building improper installation may create hazards in the event of a fire Use components such as ground fault circuit breakers and fuses as required by local authority Do not use panels near equipmen...

Страница 5: ...missible loads and are not subject to excessive forces due to the thermal expansion of the support structures Refer to the following installation methods for more detailed information Mechanical Installation Installation methods Modules can be installed on the frame using mounting holes clamps or an insertion system Modules must be installed according to the following examples Not mounting the mod...

Страница 6: ... and two clamps at the center of each long frame Insertion system Insertion system Use an insertion system on a long frame 2400 Pa Load 2400 Pa Wind Load 2400 Pa Snow Load 3800 Pa Load 3800 Pa Wind Load 3800 Pa Snow Load 5400 Pa Load 5400 Pa Snow Load 3800 Pa Wind Load Mounting system Clamping system Attachment to the long frame Length Use four clamps Use four clamps Use six clamps Clamping system...

Страница 7: ...ircuit current The recommended cable is PV wire with a cross section of at least 4mm2 No 10 The loads of 2400 Pa 3800 Pa and 5400 Pa are under IEC standard The installation methods applicable for 5400 Pa are also relevant for 3800 Pa and 2400 Pa The installation methods applicable for 3800 Pa are also relevant for 2400 Pa The module clamps must not come into contact with the front glass or deform ...

Страница 8: ...egative system grounding may be required by local authorities and can therefore be recommended In practice Suntech has observed certain installations with a positive impact on system performance due to implementation of negative system grounding If grounding is required the grounding wire must be properly fastened to the module frame to assure adequate electrical connection Suntech recommends the ...

Страница 9: ...00 600 20 STP225 20 Wd 29 6 7 61 36 7 8 15 225 1000 600 20 STP220 20 Wd 29 5 7 46 36 6 8 05 220 1000 600 20 STP215 20 Wd 29 2 7 37 36 5 7 95 215 1000 600 20 STP210 20 Wd 29 0 7 25 36 4 7 86 210 1000 600 20 STP265S 20 Wd 31 0 8 55 37 8 9 01 265 1000 600 20 STP260S 20 Wd 30 9 8 42 37 7 8 89 260 1000 600 20 STP255S 20 Wd 30 8 8 28 37 6 8 76 255 1000 600 20 STP250S 20 Wd 30 7 8 15 37 4 8 63 250 1000 6...

Страница 10: ...1000 600 20 PLUTO285 Vdm 36 1 7 90 44 9 8 46 285 1000 600 20 PLUTO280 Vdm 35 5 7 89 44 4 8 41 280 1000 600 20 W series 1640 mm 992 mm 35 mm Module Optimum Operating Voltage Vmp at STC V dc Optimum Operating Current Imp at STC A dc Open Circuit Voltage Voc at STC V dc Short Circuit Current Isc at STC A dc Maximum Power Pmax at STC Watts Maximum System Voltage IEC UL Maximum Series Fuse Rating STP26...

Отзывы: