INSTALLATION and OPERATION MANUAL
Step 3.
At the bottom of both
side rails F insert bottom rail H
and in the top part - the VTC
collector manifold A. Both
collector manifold A and
bottom rail H must lay
perpendicular to the side rails
F. Fixation orifices of collector
manifold A and bottom rail H
should match the side rails F,
while observing the correct
weight distribution scheme.
Fix A and H to side rails F using
two clamping clips C for each.
In this way the collector
framework is composed.
Diagram 12
Once you have installed the framework and the manifold, put the system together and check
its integrity and correct function. If no leaks are detected, you can install the evacuated
tubes.
Step 4.
Take the plastic tube hangers
D. Their number is equal to the
number of pipes. Place them in the
holes on the bottom rail H.
Diagram 13