SunSynk SUN-7KW-EV1 Скачать руководство пользователя страница 9

Website: www.sunsynk.com    E-mail: [email protected]

                             

        

 

6

 

Measuring with 

a test pencil

 

When  installing  the  access  line,  you  must 
use the test pencil to test the live (L) neutral 
(N) to the corresponding terminal.

 

The  device  comes  with  a 
phase  sequence  detection 
function  to  prevent  reverse 
connection  and  ensure  safe 
use of electricity.

 

 
Note:

  If  you  have  any questions  about the  above  requirements  or  use, please  contact the  equipment 

manufacturer for confirmation to ensure safe use. 

Special reminder:

 Due to the line loss during power distribution, the distribution distance of the charging 

pile should be shortened as much as possible. It is recommended that within 50 meters. If the distribution 
distance is long, the wiring diameter of 1~2 level should be increased to reduce the line loss. 
 

4.2. Device Power On Inspection and Debugging 

 

1) Pre-run check 

a)  Before running, please double-check and ensure the following items: 
b)  AC pile installation location for easy operation and maintenance 
c)  AC pile and accessories are properly connected and installed firmly. 
d)  Reasonable selection of AC inlet leakage protection switch. 
e)  No external objects or parts left on the top of the AC pile. 

 

2) Power on the device 

a)  Make sure that the above pre-operation check items meet the requirements. 
b)  Close the power supply line leakage protection circuit breaker 

 
3) Powering up the AC pile: 

a)  Normal standby: the blue light is always on. 
b)  Equipment failure: red light flashes. 
c)  Charging: Green light flashes. 

 

4.3. System Setup and Networking 

 
For the standard operating version of the charging pile, initial configuration and networking operations 
are required. The specific networking structure is as follows: 

 

Содержание SUN-7KW-EV1

Страница 1: ...ng Station SUN 7KW EV1 USER MANUAL Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales glo...

Страница 2: ...TRUCTIONS 7 4 1 PRODUCT INSTALLATION 7 4 1 1 UNPACKING INSPECTION 7 4 1 2 FIXED INSTALLATION OF PILES 7 4 1 3 ELECTRICAL INSTALLATION 8 4 2 DEVICE POWER ON INSPECTION AND DEBUGGING 9 4 3 SYSTEM SETUP...

Страница 3: ...ng gun with your hands when charging Before powering on the equipment please make sure that the input voltage frequency circuit breaker or fuse of the device and other conditions have met the specific...

Страница 4: ...230V 20 Single phase Rated output current 32A 6 10mm2 wires Standby power 6W Environment Index Application senses Indoor Outdoor Working temperature 30 C 55 C Working humidity 5 95 No condensation Wor...

Страница 5: ...e are very reasonable improve space utilization and facilitate installation and application in areas with tight land Connection abnormality It can be judged whether the charging connector is properly...

Страница 6: ...overall design is simple and generous and the themed mask can be customized The style is colorful According to special requirements it can be compatible with new and old standard electric vehicle char...

Страница 7: ...any s after sales service should be contacted immediately 4 1 2 Fixed Installation of Piles Installation tools AC charging pile installation accessories Phillips screwdriver drilling machine Charging...

Страница 8: ...pleted put it back into the lead wire of the column or protect it with a protective cover to prevent accidental exposure The following safety regulations are observed when charging and wiring the char...

Страница 9: ...vel should be increased to reduce the line loss 4 2 Device Power On Inspection and Debugging 1 Pre run check a Before running please double check and ensure the following items b AC pile installation...

Страница 10: ...ort and insert the other side into the socket of the EV charger Please check it carefully to ensure it is inserted in place and a reliable connection 2 EV Charger with Gun After the electric vehicle o...

Страница 11: ...cator flashes a red light After releasing the emergency rotate and open the button and the LED indicator is constantly blue 3 Offline Payment via Swiping Card Before charging the electric car please g...

Страница 12: ...heck whether the front distribution box can work normally and whether the circuit breaker is closed 2 Confirm that the input line is correctly connected as required 3 Make sure the Reset Button is pul...

Отзывы: