Measuring with
a test pencil
When installing the access line, you must
use the test pencil to test the live (L) neutral
(N) to the corresponding terminal.
The device comes with a
phase sequence detection
function to prevent reverse
connection and ensure safe
use of electricity.
Note:
If you have any questions about the above requirements or use, please contact the equipment
manufacturer for confirmation to ensure safe use.
Special reminder:
Due to the line loss during power distribution, the distribution distance of the charging
pile should be shortened as much as possible. It is recommended that within 50 meters. If the distribution
distance is long, the wiring diameter of 1~2 level should be increased to reduce the line loss.
4.2. Device Power On Inspection and Debugging
1) Pre-run check
a) Before running, please double-check and ensure the following items:
b) AC pile installation location for easy operation and maintenance
c) AC pile and accessories are properly connected and installed firmly.
d) Reasonable selection of AC inlet leakage protection switch.
e) No external objects or parts left on the top of the AC pile.
2) Power on the device
a) Make sure that the above pre-operation check items meet the requirements.
b) Close the power supply line leakage protection circuit breaker
3) Powering up the AC pile:
a) Normal standby: the blue light is always on.
b) Equipment failure: red light flashes.
c) Charging: Green light flashes.
4.3. System Setup and Networking
For the standard operating version of the charging pile, initial configuration and networking operations
are required. The specific networking structure is as follows: