10
2.5) Repair and Maintenance
When machine repair is needed, it shall be conducted by SunStar A/S
engineers only who have finished the due training course.
1) For cleaning and repair, cut the main power supply. Wait for 4 minutes before starting
maintenance to make the machine completely discharged.
2) Do not modify the machine specifications or parts without substantial consultations
with SunStar. Otherwise, it may threaten safety during machine operation.
3) Use the parts manufactured by SunStar to repair or replace the machine parts during
A/S service.
4) When repairing is completed, re-install all the removed safety covers.
Danger
2.6) Devices for safety
ⓐ
Safety label : It describes cautions during operating the machine.
ⓑ
Thread take-up cover : It prevents from any contact between body and take-up lever.
ⓒ
Motor Cover : It prevents from insertion of hands, feet or clothes by Motor.
ⓓ
Label for specification of power : It describes cautions for safety to protect against
electric shock during rotating the motors. (Voltage input / use Hz)
ⓔ
Finger guard : It prevent from contacts between a finger and needle.
ⓕ
Safety plate : It protects eyes against needle breaks.
Caution
ⓐ
ⓕ
ⓔ
ⓓ
ⓑ
ⓒ
For main shaft motor and X,Y drive box, it takes 10 minutes before they
are completely discharged after the main power is cut.
Caution
Содержание SPS/E-BR1202 Series
Страница 37: ...38 9 9 Drawing of Table 9 1 SPS E BS R 1202 ...