No. 7, Road 12, Industrial Zone, Taichung City 407, Taiwan
Tel: 886-4-2359-1190 Fax: 886-4-2359-3409
[email protected] www.sunriseiw.com.tw
16
The controller can store 50 programs, and each program can have up to 10 steps. A
program can be consider as a working job, and a step is one bending operation. The
END inform the controller the last step of the program. Example, if END=2, then
only step 1 and 2 in the program will be executed.
For each STEP, there are 4 parameters:
BACK: the back position of the cylinder when retracted.
SLOW: when moving forward, the cylinder first move at fast speed and low
pressure. When SLOW is reached, the cylinder turns to slow speed and high
pressure. The cylinder should be in slow speed before the bending started.
The SLOW position is also the reference point for the NC stopper to retract
right before the bend start (refer to NC stopper section for more detail).
FORWARD: The cylinder stopps at the FORWARD position. Adjust this position
for the angle of bend.
GAUGE: This is position of the NC stopper when the NC gauge function is turned
ON.