background image

 

14 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

WARRANTY REGISTRATION 

 
Please enter your Warranty Registration on line at: www.sunquestsolarpanel.com 

 

 

or 

Please complete and mail to the address below: 
 

Name :    

 

 

 

 

 

 

Phone # :    (            )  

 
Address :  
 
City :     

 

 

 

 

 

Prov/State :  

 

Postal/Zip Code : 

 
Dealer name :    

 

 

 

 

 

 

 

Date of purchase :  

 
Retail Price : 

 

 

 

Pool size :  

 

 

 

Signature : 

 

Sunsolar Energy Technologies Inc 

3262 F-X Tessier 

Vaudreuil-Dorion, Qc, J7V 5V5

 

SunQuest Solar Panel 

Five Year Limited Warranty 

Five year limited warranty from date of purchase with one full year. After the first year, the claimant shall pay the list price at the date of the claim 
less one-sixtieth ( 1/60 ) of the price for each full month remaining in the warranty period. Sunsolar Energy Technologies Inc. warrants to the 
original purchaser of the Solar Panel that the company will, at its option, repair or replace any solar panel that proves to be defective in either 
workmanship or material upon prepaid return of the solar panel by the owner to Sunsolar Energy Technologies Inc subject to the provisions of the 
limited warranty stated above, and the exclusion and limitations set forth below.  
 
What is covered : The solar collector is warranted to be free of defects in material and workmanship when leaving the factory. 
What is not covered : Hardware; including hoses, clamps and plastic fittings; any damage due to freezing caused by or related to improper drainage, 
winterization, or storage. Damage, defects, malfunctions, or other failures arising from use of the product which does not comply with the 
instructions provided by the manufacturer. Damage, defects, malfunctions, or other failures caused by or related to repairs performed by any servicer 
other than an authorized service representative of Sunsolar Energy Technologies Inc. Claims will not be accepted for a solar panel's damage in 
transit unless damage to shipping container is noted at time of delivery on the transport company's delivery bill. 
 
Sunsolar Energy Technologies Inc shall in no way be liable or responsible under any circumstances or in any amount for any consequential or 
incidental damages or for any injury or damages to person or property using or used in connection with this product, or for loss of profits or other 
costs or expenses of any kind or character. There are no other warranties or representations, either express or implied, whether of merchantability, 
fitness for a particular purpose, or other, made by Sunsolar Energy Technologies Inc., other than those specifically set forth in this warranty. No 
person, firm, or corporation is authorized to make any representations, or incur any obligations in the name of or on behalf of Sunsolar Energy 
Technologies Inc. except as stated herein. This warranty is expressly understood to be the exclusive remedy available to the purchaser, and this 
warranty contains the full and complete agreement between Sunsolar Energy Technologies Inc and the purchaser. This warranty sets forth the only 
obligations of Sunsolar Energy Technologies Inc. with regard to this product, and there are no warranties which extend beyond the description on 
the face hereof. 
 
To file a claim : Call 1-888-357-6527 to initiate a claim. Please allow 2-4 weeks for warranty claims to be settled.  
 
The representation set forth herein are the only representations made by Sunsolar Energy Technologies Inc with respect to the product, and this 
warranty does not constitute either a performance or satisfaction guarantee. It is the responsibility of the product owner to regularly test and check 
the product for proper function and safety. 
 

Sunsolar Energy Technologies Inc., 3262 F-X Tessier, Vaudreuil-Dorion, Qc, J7V 5V5

 

Содержание SQ-1212-REP

Страница 1: ...Model SQ 2212 SPACE SAVER INSTALLATION OPERATION MANUAL Read all the instructions before installing your solar heating system ...

Страница 2: ...ay from your pool or one story up then your pump may need to be 1HP or more Where can the solar panel be placed The solar panel can be placed on the ground Avoid placing in high traffic areas as it is not recommended to walk on the solar panel The solar panel can also be mounted on a rack or a roof When mounted the panel should preferably be facing south and be inclined at a 30 0 to 45 0 degree an...

Страница 3: ... Roof Mounting Kit SQ RMK5 High Wind Roof Mounting Kit SQ HWK 1 SQ RMK5 per SQ 2212 system is required for Roof For high wind areas to be used in addition to the roof mounting or Rack installation kit SQ RMK5 1 SQ HWK per SQ 2212 system is required plus one extra Qty Part Description Qty Part Description 5 SK RMK ST M Coated metal strap 2 SK RMK BASE Mounting base 15 BOLT Z Lag bolt 2 2 SK RMK CAP...

Страница 4: ...ded to connect 3 SQ 2212 systems Includes add on kits vacuum relief kit high wind kits diverter kit Qty Part Description Qty Part Description 1 SK FTG A Threaded 2 way valve 4 SK FTG K Rubber hose 3 75 2 SK FTG B Threaded nipple 8 SK FTG L Metal collar Hose clamp 2 SK FTG C Threaded tee 1 SK VRV Vacuum Relief Valve 4 SK FTG D Threaded combination hose adapter 1 SK FTG M Reducer Adapter 1 5 to 0 75...

Страница 5: ...a Installation one system on ground Diagram Step 3a Apply Teflon tape to threads of all 4 caps SK FTG F See Fig 3a 1 Thread all 4 caps into the panels as per Diagram Step 3a Do not over tighten See Fig 3a 2 Put O rings SK FTG I on both combination adapters SK FTG D See Fig 3a 3 Thread both combination adapters into the panels as per Diagram Step 3a Do not over tighten See Fig 3a 4 Push the rubber ...

Страница 6: ...hose you cut in half previously over the panel header as per Diagram Step 3b Slide a metal collar SK FTG L onto the rubber hose Place metal collar 1 4 from edge and tighten collar with screwdriver See Fig 3a 5 Repeat for other end of panel Slide another metal collar onto the rubber hose Connect the 2 panels together by pushing the rubber hose over the second panel header Tighten metal collar to se...

Страница 7: ...ush the rubber hose SK FTG J over the panel header as per diagram Step 3c Slide a metal collar SK FTG L onto the rubber hose Place metal collar 1 4 from edge and tighten collar with screwdriver See Fig 3a 5 Repeat for 2 nd system Slide another metal collar onto the rubber hose Connect the 2 panels together by pushing the rubber hose over the second panel header Tighten metal collar to secure assem...

Страница 8: ...oth combination adapters into the panels as per Diagram Step 3d Do not over tighten See Fig 3a 4 OR If you are using rigid piping to connect panels to your pump then apply Teflon on both PVC adapters SK FTG N See Fig 3d 1 Thread both adapters into the panels as per Diagram Step 3d Do not over tighten See Fig 3d 2 Apply Teflon on reducer adapter SK FTG M Thread reducer adapter into the panel as per...

Страница 9: ...inlet This will allow the panel to drain properly Note The inlet must always be at the lower end of the panel and the outlet at the higher end of the panel Note A maximum of 12 2ft panels 6 systems may be plumbed in parallel For high wind areas you can install the Nylon straps and Vinyl straps from System Kit Mark a spot 6 to the top of the outlet Mark spots 6 to the top of every second rubber hos...

Страница 10: ...onnect another hose not supplied from the panel outlet to the pool inlet See Diagram C 1 4 Make sure that your hoses are all connected the correct way and that all the collars have been tightened Unblock the inlet and outlet of your pool 5 Turn on your pool pump Check for any leaks If any of the threaded fittings leak remove the fitting and apply more Teflon If any of the hoses leak at the connect...

Страница 11: ... tighten See Diagram C 2 5 Take the last hose not supplied and connect it to the last open end of the diverter kit Place metal collar and tighten Connect the other end of the hose to your pool inlet Place metal collar and tighten See diagram C 2 6 Make sure the valve on the diverter is on the open position Valve in the open position Valve in the closed position Solar heating is OFF not heating Sol...

Страница 12: ... that all your piping in drained 4 Run you feed and return PVC piping from your pool to your solar panels Make sure piping is installed in such a way to allow proper drainage 5 Make sure that your piping is connected the correct way and that all joints have been glued Unblock the inlet and outlet of your pool 6 Turn on your pool pump Check for any leaks You will see air bubbles coming from the poo...

Страница 13: ...closed turn your by bass valve in such a way to allow the water from your panels to drain Wait half an hour for panels to drain Unscrew the Vacuum Relief Valve or the Threaded cap at the top of the solar system Unscrew the Threaded cap at the bottom of the solar system and make sure all the water is drained out of the system All your plumbing should be installed in such a way to allow full drainag...

Страница 14: ...ologies Inc Claims will not be accepted for a solar panel s damage in transit unless damage to shipping container is noted at time of delivery on the transport company s delivery bill Sunsolar Energy Technologies Inc shall in no way be liable or responsible under any circumstances or in any amount for any consequential or incidental damages or for any injury or damages to person or property using ...

Отзывы: