
For questions or concerns, please visit us at www.sunoptics.com, or call your nearest Sunoptics representative.
SUNOPTICS
® | 6201 27th Street, Sacramento, CA 95822 | 916.395.4700 | 800.289.4700 |
www.sunoptics.com
Page 7 of 14
9.
Install the eave side thermal break (#4a) by sliding the thermal break between the purlin and insulation.
10.
Place mounting bracket (#8) on the center purlin and fasten to purlin using (5) 1” concealer head screws
(#11) using the predrilled holes as a guide for placement.
11.
Return to the eave side of the rails and using a carpenter’s square to check the rails are square to each other
and are on the mark from step 7.