
13. Remove Hardware securing Wiring Conduit to
rear of Machine and tie Wiring Conduit off to side
of Machine
(see Figure 1-6)
.
14. Remove two (2) Conduit Hangers from rear of
Machine
(refer to Figure 1-6)
. Lay Hangers and
Hardware aside for reinstallation after Column is
installed.
15. Remove Right & Left Rear Guarding rear of the
Machine
(see Figure 1-7)
. Lay Guarding and
Hardware aside for reinstallation after column is
installed.
Install Column
16. Obtain Fork Lift with required vertical
movement and lift capacity to lift Column into
position on Riser Weldment.
17. Position Forks so they slide into Lifting Sleeves,
provided on top of Machine.
3
FIGURE 1-6, Wiring Conduit
CONDUIT
HANGER
FIGURE 1-7, Left & Right Rear Guarding
FIGURE 1-8, Fork Positioning
FORKS
SPINDLE
ASSMBLY
GUARDING
FIGURE 1-9, Column
STRAP
BLOCK
GUIDE
LINES
FORKS
FORKS
BALLSCREW
FORKS
FIGURE 1-10, Shipping Base
SHIPPING
BASE
COLUMN
SCREW
MOTOR
Содержание SV-2460
Страница 14: ...8 NOTES...
Страница 22: ...16 NOTES...
Страница 26: ...20 NOTES...
Страница 32: ...26 NOTES...
Страница 36: ...30 NOTES...
Страница 38: ...32 NOTES...
Страница 40: ...34 NOTES...
Страница 41: ...1 OF 2 C DECLARATION OF CONFORMITY 35 SAMPLE CE DOCUMENT...
Страница 42: ...2 OF 2 C DECLARATION OF CONFORMITY 36 SAMPLE CE DOCUMENT...