Fig.16: Settle back card slot 1 (J1) and back card slot 2 (J2) to edge beam and middle beam, and secure one side of
back card slot to edge beam by using bolt (HH) and flat washer (BB).
Fig.16-1: Use bolt (CC) and flat washer (BB) to secure the back card slot 1(J1) and back card slot 2(J2) to the middle
beam (L3)
Fig.17: Set the side card slot 1 (N1) and side card slot 2 (N2) to side PC panel, and secure them with bolt HH and flat
washer BB.
Fig.18: Insert the PC panel 1(M1) into the slot of middle beam (L3), install the edge beam 1(L1) and edge beam 2(L2)
Fig.18-1: Insert the PC panel (N) into the slot of middle beam (L3), install the edge beam1 (L1) and edge beam2 (L2) the
same way.
Fig.18-2: Insert PC panel 1(M1) into the bottom card slot of middle beam (L3), install edge beam 1(L1) and edge beam
2(L2) the same way.
Fig.19: Insert the bolt (JJ) into the bottom card slot of middle beam (L3), edge beam 1 (L1) and edge beam 2 (L2), then set
the front card slot 1 (K1) to complete bolt (JJ) and insert the front card slot into the PC panel. Install front card slot 2(K2)
the same way, see step 3.
Fig.20: Install the blank 2(T2) to edge beam 2(L2) and front card slot 2(K2), and secure them with bolt DD and flat
washer BB. Same way to install the blank 1(T1) and blank 3(T3), see step 3.
KK
Nail Φ8X250MM
14 PCS
LL
Screw M6*80
8PCS
Hardware Pack 4
EE
Plastic ring
76PCS
Hardware Pack 5
Содержание L-GZ605PST-A1
Страница 13: ...Supplement ...