background image

   

 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) 

[email protected]

 | 

www.sungrowpower.com.au 

SH5K+_GD_Quick Commissioning Guide_201803 

Page 1 of 3

 

Quick Commissioning

 

Guide

 

This  document  is  intended  to  assist  installers  in  commissioning  an  SH5K+  Hybrid 

inverter  and  an  SB4K8  Sungrow/Samsung  battery  (as  an  example).  While  every 

attempt has been made to simplify the commissioning, some fields may vary due to 

network compliance regulations and specifics of the installation. 

 

 

W b

W b1

4G

O &8aY

A A
A A

A B4DF 4> 7OPK U

DOKM S O B

O

A A

A C
A C

5K O b FbYO

(

A

5K O b

A >S&S W E WQ

A >S&S W >:

5K G KQO FS O
2 HOOTNKb G KQO

HOOTOWN G KQO

APP&: SN EO SWQ
A 7S KLUO

A 8WKLUO

8WN

WPS

8aS 3

8W O

M WPS

YUO O SWS SKU

WM

OM M WPSQ K S W

Kb

EO SWQ " 8aS

MK O K PK U d

8WKLUO A >I SP KW 8BE WS RK O LOOW
M WWOM ON >OK O K NOPK U )  P

DO O O

KYKMS b

EO APP&: SN

W S W

8K R PK U L ccO

SUU

WN

4

K SM O

HSUU

Y KP O

OM WN

FO 8K R K U

4

K SMKUUb O

W

KSW

4UK

OW KP O

OM WN

EOUOM >S&S W E WQ

KWN OW O F Kb

W

LO OZ KU LK O b WS

EO 5K O b FbYO

4WN BK K O O

KUUb UOK O K NOPK U

WUO

RO

S O SW

M ON

EO 5K O b G KQO

FS O

>OK O K NOPK U A

RKWQO WUb SP

OZ S ON Lb WO

T OZ S O OW

EO RO OKM S O

A B

B

O

A C Y

7OPK U S 4E(

E -/// EOUOM U MKU

WO

T YO K

K OZ S ON

EO RO M

W b

KWN Q SN KWNK N

>OK O K NOPK U .)))H

RKWQO WUb

SP OZ S ON OaY

US S

EO

O

8aY

WS SKU O SWQ P

E WQ

E . %

E K

FS O

RR 1

1

EO RO U MKU S KO KWN NK O FRS S
M S SMKU

ROW K LK O b S M WWOM ON

EO RO S O

/1 +1 )

7K O

77 ( ?? ( II

+ ( ) ( 0

Отзывы: