5 Commissioning
25
Step 12
Inverter will enter into startup process.
Observe status of LED indicators and the LCD
main screen. If inverter‘s commissioning
succeeds, the “RUN” indicator will be lit and
“RUN” will be displayed on the “State” area.
If inverter’s commissioning fails, the “FAULT” indicator will be lit and “fault” will occur
on the display. Press
j
to view “current fault” information. Remove the existing fault
and then repeat starting up inverter as the above procedures.