38
6 Commissioning
6.1 Inspection before Commissioning
Check the following items before starting the inverter:
1.
The inverter DC switch and external circuit breaker are disconnected.
2.
The inverter should be accessible for operation, maintenance and
service.
3.
Nothing is left on the top of the inverter.
4.
The inverter is correctly connected to the external devices, and the
cables are routed in a safe place or protected against mechanical
damage.
5.
The selection of the AC circuit breaker is in accordance to this manual
and all applicable local standards.
6.
All unused terminals at the bottom of the inverter are properly sealed.
7.
Warning signs and labels are suitably affixed and durable.
6.2 Button Function
Inverter offers two buttons with multiple functions. Please refer to the following
table before any operation of the inverter.
Tab. 6-1
Button function
Button
Operation
Description
ESC
≤1.2 s
Navigate up / down or change the setting values.
Hereinafter referred to as “
Touch ESC
”.
>
1.2 s
Return to a previous menu or cancel the settings.
Hereinafter referred to as “
Press ESC
”.
ENT
≤1.2 s
Move left or right, or turn pages, or view the active
error/warning from the main screen.
Hereinafter referred to as “
Touch ENT
”.
>
1.2 s
Enter the sub-menu or confirm a selection or settings.
Hereinafter referred to as “
Press ENT
”.
Содержание SG2K-S
Страница 2: ......