4.4.
AC Grid Connections
Note that The AC grid connection is designed to fit the 3–phase grid,
which must be provided by the end-user, using a 3-phase system equipped
for 400 V.
The connection terminals are located in the lower right corner of
chamber.
Caution
::
To reduce the risk of fire, connect only to a circuit
provided with 250 amperes maximum branch circuit over current
protection.
Note
::
When connecting external AC wires to the SG100K3,
positive phasing sequence must be maintained throughout the
installation process
4.4.1.
Connection Process
1. Route the Line Grid L
1
, L
2
, L
3 and Neutral
wires through the cable
entry holes.
2. Connect the wires to terminals marked L
1
, L
2,
L3
and N
respectively,
see Figure 4-7.
3. Secure the AC Line wires to the terminal with screws.
Figure 4-7 AC output wire routing
Содержание SG100K3
Страница 1: ...S SG100K3 G Grid Connected Inverter Installation Manual SG100K3 3B E Ver65 200907 Version 6 5...
Страница 8: ...Safety Instructions Chapter 1 provides important safety instructions about SG100K3...
Страница 13: ...5 I Introduction Chapter 2 provides basic information about SG100K3...
Страница 34: ...26 Commissioning Chapter 5 describes the verification and commissioning of SG100K3...
Страница 37: ...29 Appendix...