Inspection Before Commissioning

Check the following items before 

Environment inspection

 

The wireless communication module is installed in a place convenient for 
operation and maintenance.

 

Ensure again that the wireless communication module is firmly in place.

 

The installation environment is well-ventilated.

 

The wireless communication module is correctly connected to the 
inverter.

 

The cables are appropriately routed and well protected against 
mechanical damage.

 

Make sure the inverter to be connected has a correct SN number 
(product serial number). 

 

Commissioning Steps

When all the foregoing items meet requirements, start the wireless 
communication module for the first time.

 

Connect the AC circuit breakers.

 

Connect the DC switches of the inverter.

 

If the sunlight is sufficient, the PV panel starts to supply DC power to the 
inverter. When the DC voltage exceeds the start voltage of the inverter, 
the inverter will automatically start. 

Wait  about  15s  for  the  wireless  communication  module  to  start 
automatically.

 

Download  the  iSolarCloud  APP  and  configure  the  parameters  of  the 
inverter connected with the wireless communication module. For details, 
refer to the corresponding quick operation guide.

Содержание EyeM4

Страница 1: ...User Manual...

Страница 2: ......

Страница 3: ...s well as installation operation and maintenance description Related Documents This manual may not cover all information on the wireless communication module For more information visit the website at...

Страница 4: ...II...

Страница 5: ...ce Principle Description Function Description Unpacking and Inspection Nameplate Scope of Delivery Storage Installation Location Installation Preparation before Installation Installation Steps Inspect...

Страница 6: ......

Страница 7: ...munication module to the inverter bottom Commission the wireless communication module Operate and maintain the wireless communication module Upon receiving check whether the wireless communication mod...

Страница 8: ...ical installation Poor ventilation will compromise the system performance Ensure that the device is well ventilated and sufficiently cooled down during operation Electrical connection All electrical c...

Страница 9: ...ts contained in the wireless communication module If maintenance work is required contact SUNGROW Never replace the internal components without permissions Otherwise SUNGROW shall not be held liable f...

Страница 10: ...Observe the following items Grid connection rules Safety descriptions of other electrical devices...

Страница 11: ...essory port Application of the wireless communication module WLAN Inverter Communication base station Ethernet APP Wireless signal EyeM4 Wireless signal iSolarCloud Remote monitoring platform Communic...

Страница 12: ...dule can be connected to the inverter through the standard RS485 interface thereby obtaining inverter running data The running data is transmitted to the remote server in the Wi Fi wireless communicat...

Страница 13: ...n the following figure 3 1 Unpack and check Read the manual Install the wireless communication module Electrical connection Inspection before commissioning Commissioning Start Start End Troubleshootin...

Страница 14: ...uctions Store the wireless communication module properly if it is not installed immediately Select the optimum installation site Install the wireless communication module Electrical connection Inspect...

Страница 15: ...o the packing list Check whether the device in the packing case is intact and is free of damage If there any damage contact the forwarding company or SUNGROW Take a picture of the damage with which we...

Страница 16: ...held liable for any damage caused The wireless communication module must be packed in its original packing case with desiccant kept inside The packing case must be sealed with adhesive tape The wirel...

Страница 17: ...Regularly check the wireless communication module during storage recommended once every six months and replace the packing material if necessary The packing case must be upright...

Страница 18: ...temperature 60 C Min ambient temperature 30 C Max relative humidity 95 non condensing Installation Preparation before Installation Adapter inverter single phase residential inverter and three phase s...

Страница 19: ...nverters in the daisy chain manner through the RS485 communication cables as described in the corresponding user manual Inverter 1 RS485 Inverter 2 Inverter n n 10 RS485 RS485 Multiple inverters in da...

Страница 20: ...cted has a correct SN number product serial number Commissioning Steps When all the foregoing items meet requirements start the wireless communication module for the first time Connect the AC circuit...

Страница 21: ...e Pack the wireless communication module in its original packing case and seal the RJ45 interface at the bottom of the inverter with supplied waterproof plug If the wireless communication module will...

Страница 22: ......

Страница 23: ...3G3...

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Отзывы: