Inspection Before Commissioning
Check the following items before
Environment inspection
The wireless communication module is installed in a place convenient for
operation and maintenance.
Ensure again that the wireless communication module is firmly in place.
The installation environment is well-ventilated.
The wireless communication module is correctly connected to the
inverter.
The cables are appropriately routed and well protected against
mechanical damage.
Make sure the inverter to be connected has a correct SN number
(product serial number).
Commissioning Steps
When all the foregoing items meet requirements, start the wireless
communication module for the first time.
Connect the AC circuit breakers.
Connect the DC switches of the inverter.
If the sunlight is sufficient, the PV panel starts to supply DC power to the
inverter. When the DC voltage exceeds the start voltage of the inverter,
the inverter will automatically start.
Wait about 15s for the wireless communication module to start
automatically.
Download the iSolarCloud APP and configure the parameters of the
inverter connected with the wireless communication module. For details,
refer to the corresponding quick operation guide.
Содержание EyeM4
Страница 1: ...User Manual...
Страница 2: ......
Страница 4: ...II...
Страница 6: ......
Страница 10: ...Observe the following items Grid connection rules Safety descriptions of other electrical devices...
Страница 22: ......
Страница 23: ...3G3...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......