19
7 Commissioning
7.1 Checking before Commissioning
No.
Inspection item
Result
1
Whether all cables are undamaged, well insulated, and
appropriately sized.
□
2
Whether all cable are securely in place.
□
3
Whether the power supply cable and the grounding cable
are correctly connected.
□
7.2 Running Steps
Tab. 7-1
Commissioning steps
No.
Commissioning steps
Result
1
Inspection before commissioning
□
2
The local controller is powered on
□
3
Connect the debugging PC to the ETH2 (default IP
address of the port is 192.168.1.100) of the local
controller by using the cable.
Log into the local controller operation interface via the IE
browser or the Google browser.
□
4
Ensure that the device is firmly connected to the local
controller.
□
5
Perform
system
networking
configuration
and
communication parameter configuration on the WEB
page, where the type of actual connected device,
operation strategy, and the like are consistent with actual
system requirements.
□
6
The system starts commissioning. Observe whether the
device communication parameter is normal.
□
Notice: Device addresses should be different for the same
communication port.
Save operations. Otherwise, the settings are invalid.
Содержание EMS200
Страница 1: ...EMS200 V12 UEN Ver11 201812 EMS200 Local Controller User Manual...
Страница 2: ......
Страница 6: ...IV...