Commissioning
6.1
Check before Commissioning
N
No
o..
IItte
em
m
R
Re
essu
ulltt
1
All cables are intact, well insulated, and appropriately
dimensioned
□
2
All cables are connected correctly and firmly
□
3
The polarity of the power supply cable is correct. The
ground cable is reliably grounded
□
4
Seal the gaps at the bottom of the waterproof terminals
with fireproof mud
□
6.2
Commissioning Steps
When all the foregoing items meet requirements, commission the COM100 for the first
time.
N
No
o..
S
Stte
ep
p
R
Re
essu
ulltt
1
Inspection before commissioning
□
2
Turn the miniature circuit breaker inside the COM100 to
the ON position.
□
3
Turn on the internal MPLC switch of COM100 if you use
the PLC module.
□
3
Check whether the indicators of Logger1000 inside the
COM100 normally flash.
□
4
Connect the debugging PC to the "ETH" port of the
Logger1000 via the network cable (default IP address of
"ETH": 12.12.12.12).
Log in the Web at 12.12.12.12 through the IE or Chrome
browser.
□
5
Make sure the communication cable connecting the
device and the Logger1000 inside the COM100 is firmly
in place, and connect the DC circuit breaker of the
inverter to ensure the inverter is supplied with power.
□
6
Configure related parameters referring to the user
manual of Logger1000.
□
7
Enable the DHCP service of the router.
□