
7
step 2
Fasten the device in the order of M10 nut (A) , hanger (B), wall surface (C) and bolt (D),
where the fastening torque is 37±3N.m.
step 3
Check to ensure COM100 is firmly in place.
-- -- E
En
nd
d
3.3.2 Ground Mounting
For the ground mounting, the device is fixed via the foundation bolts pre-embedded in
the foundation.
step 1
Construct the foundation according to the exterior dimensions of COM100.
step 2
Pre-embed the foundation bolts in the four foundation corners, where the bolts are of
M10.
User Manual