![Suncourt RADON RDN04 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/suncourt/radon-rdn04/radon-rdn04_installation-instructions-manual_1395332006.webp)
The bypass is constructed with a 45 degree Wye fitting at the bottom of the outlet stack.
The bottom of the Wye is capped and fitted with a tube that connects to the inlet piping or
other drain. The condensation produced in the outlet stack is collected in the Wye fitting
and drained through the bypass tube. The bypass tubing may be insulated to prevent
freezing.
Failure to install a proper condensate collection system voids the product warranty.
MAINTENANCE
Inspect the product at least once every 12 months for excessive dust and dirt build up on
the impeller (more often in dusty environments). Clean as necessary. The unit must be
disconnected from power during inspection and/or cleaning.
“SYSTEM ON” INDICATOR
A properly designed system should incorporate a “System On” Indicator to confirm system
operation mode or status. A manometer, such as a U-Tube, or a vacuum alarm is
recommended for this purpose.
SLAB COVERAGE
The Suncourt Radon Fan provides coverage up to 2000 sq. ft. per slab penetration
depending on type of sub slab material. If one slab penetration does not sufficiently
mitigate the Radon then additional slab penetration points can be added as required.
Detailed Radon information is available on the EPA’s website at:
http://www.epa.gov/radon/
Radon Print
http://www.suncourt.com/Radon Print.html
6 of 7
1/2/2012 2:01 PM