Preparing for Installation
17
Handling Precautions
Caution –
Deploy the antitilt bar on the equipment rack before beginning an
installation.
Caution –
The server weighs approximately 60 lb (25. kg). Two people are required
to lift and mount the server into a rack.
Caution –
When completing a two-person procedure, always communicate your
intentions clearly before, during, and after each step to minimize confusion.
Related Information
■
“ESD Precautions” on page 17
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded
antistatic wrist strap, foot strap, or equivalent safety equipment to prevent
electrostatic damage (ESD) when you install or service the servers.