background image

SPARC T3-1 Server

Installation Guide

Part No.: E21414-04
March 2012

Содержание SPARC T3-1

Страница 1: ...SPARC T3 1 Server Installation Guide Part No E21414 04 March 2012 ...

Страница 2: ...oncédés sous licence et soumis à des restrictions d utilisation et de divulgation Sauf disposition de votre contrat de licence ou de la loi vous ne pouvez pas copier reproduire traduire diffuser modifier breveter transmettre distribuer exposer exécuter publier ou afficher le logiciel même partiellement sous quelque forme et par quelque procédé que ce soit Par ailleurs il est interdit de procéder à...

Страница 3: ...l Specifications 6 Input Power Overview 7 Guidelines for Planning Power Requirements 8 Acoustic Noise Emissions 10 Agency Compliance Specifications 10 Operating Environment Requirements 11 Airflow Considerations 11 Front Panel Components 12 Front Panel System LEDs and Buttons 14 Rear Panel Components 17 Rear Panel System LEDs and Button 18 Server Handling Precautions 19 ESD Precautions 20 Tools Ne...

Страница 4: ...ent Arm 40 Verify Correct Operation of the Slide Rails and the CMA 44 Connecting the Server Cables 47 Cabling Requirements 47 Connect the SER MGT Port Cable 49 Connect the NET MGT Port Cable 50 Connect the Ethernet Network Cables 51 Connect Other I O Cables 51 Prepare the Power Cords 52 Cable Management Overview 53 Secure the Server Cables in the CMA 53 Powering On the Server For the First Time 55...

Страница 5: ...Contents v Glossary 63 Index 67 ...

Страница 6: ...vi SPARC T3 1 Server Installation Guide March 2012 ...

Страница 7: ...Documentation Links All Oracle products http www oracle com documentation Oracle Solaris OS and other systems software http www oracle com technetwork indexes documentation index ht ml sys_swhttp www oracle com technetwork indexes documentation index html sys_swhttp www oracle com technetwork indexes docu mentation sys_sw Oracle Integrated Lights Out Manager ILOM 3 0 http www oracle com pls topic ...

Страница 8: ...le com goto docfeedback Support and Accessibility Description Links Access electronic support through My Oracle Support http support oracle com For hearing impaired http www oracle com accessibility support html Learn about Oracle s commitment to accessibility http www oracle com us corporate accessibility index html ...

Страница 9: ...age 4 Front Panel Components on page 12 Front Panel System LEDs and Buttons on page 14 Rear Panel Components on page 17 Rear Panel System LEDs and Button on page 18 Server Handling Precautions on page 19 ESD Precautions on page 20 Tools Needed for Installation on page 21 Optional Component Installation on page 21 Installation Task Overview The following diagram illustrates the main server installa...

Страница 10: ...2 SPARC T3 1 Server Installation Guide March 2012 FIGURE Server Installation Task Flowchart Server Overview The server is a rack mountable system with a 2RU form factor ...

Страница 11: ...o sixteen DDR3 memory modules A hard drive enclosure with 8 or 16 drive bays and a corresponding connector backplane that can support either 8 or 16 hard disk drives HDDs An optical disk drive that fits into the hard drive enclosure and plugs into the disk backplane Six fan modules two fans per module One or two power supplies and associated power distrubution circuitry I O interface assembly to s...

Страница 12: ...ns on page 6 Input Power Overview on page 7 Acoustic Noise Emissions on page 10 Agency Compliance Specifications on page 10 Operating Environment Requirements on page 11 Airflow Considerations on page 11 Physical Specifications Related Information Minimum Clearance for Service Access on page 5 TABLE System Specifications Measure U S Metric Width 16 75 in 425 5 mm Depth 28 13 in 714 5 mm Height 2 r...

Страница 13: ...ation 5 Minimum Clearance for Service Access Related Information Physical Specifications on page 4 TABLE Minimum Clearances Needed Description Clearance Clearance front of system 36 in 91 cm Clearance rear of system 36 in 91 cm ...

Страница 14: ...ty levels Operating in this temperature range provides a buffer if the environmental support systems fail Relative Humidity 10 to 90 RH 27 C maximum wet bulb noncondensing IEC 60068 2 56 Test Cb 93 RH 35 C maximum wet bulb noncondensing IEC 60068 2 56 Test Cb Ambient relative humidity levels between 45 and 50 are the most suitable for data processing operations in order to Prevent corrosion Provid...

Страница 15: ... 41 Test Z BM 40 000 ft 12 000 m IEC 60068 2 13 Test M Vibration 0 15 G x axis 0 10 G x y axes 5 500 Hz swept sine IEC 60068 2 6 Test Fc 0 5 G x axis 0 25 G x y axis 5 500 Hz swept sine IEC 60068 2 6 Test Fc Shock 3 Gs 11 ms half sine IEC 60068 2 27 Test Ea Roll off 1 inch roll off free fall front to back rolling direction Threshold 25 mm threshold height at 0 75 m s impact velocity ETE 1010 02 Re...

Страница 16: ...er configuration using your planned workload Refer to one of the following tables based on the model of your server TABLE SPARC T3 1 Server 8 Disk Capacity Power Specifications General Specifications Values Operating input voltage range input voltage tolerance 10 100 to 240 VAC 50 60 Hz Maximum operating input current at 100 VAC Maximum operating input current at 200 VAC 8 4 A 4 2 A Maximum operat...

Страница 17: ...t power at 100 VAC Maximum operating input power at 200 VAC 896 W 888 W Maximum heat dissipation at 100 VAC Maximum heat dissipation at 200 VAC 3057 BTU hour 3226 KJ hour 3030 BTU hour 3197 KJ hour Maximum standby power 30 W Inrush current peak 25 A Leakage current 1 6 mA Maximum Server Configuration Specifications Under Nominal Temperature and Voltage Conditions 16 core 1 6 GHz processor with six...

Страница 18: ...Declared noise emissions for the SPARC T3 1 server are in accordance with ISO 9296 standards Related Information Server Specifications on page 4 Agency Compliance Specifications Refer to the SPARC T3 1 Server Safety and Compliance Guide for a full list of agency compliance specifications Related Information Server Specifications on page 4 TABLE Acoustic Noise Emissions for the SPARC T3 1 Server De...

Страница 19: ...ating computer equipment in extremes of temperature or humidity increases the failure rate of hardware components To minimize the chance of component failure use the server within the optimal temperature and humidity ranges Related Information Airflow Considerations on page 11 Minimum Clearance for Service Access on page 5 Airflow Considerations Proper airflow into and out of the server is essenti...

Страница 20: ...e are recommended for improved cooling performance Note The combination of inlet and exhaust restrictions such as cabinet doors and the spacing of the server from the doors can affect the cooling performance of the server and should be evaluated by the user Take care to prevent recirculation of exhaust air within a rack or cabinet Manage cables to minimize interfering with the server exhaust vent ...

Страница 21: ...rd drive HDD5 2 RFID tag 9 Hard drive HDD6 3 Hard drive HDD0 10 Hard drive HDD7 4 Hard drive HDD1 11 SATA DVD module 5 Hard drive HDD2 12 USB port 2 6 Hard drive HDD3 13 USB port 3 7 Hard drive HDD4 Figure Legend 1 System controls and indicators 12 Hard drive HDD9 2 RFID tag 13 Hard drive HDD10 3 Hard drive HDD0 14 Hard drive HDD11 4 Hard drive HDD1 15 Hard drive HDD12 5 Hard drive HDD2 16 Hard dr...

Страница 22: ...e 17 Rear Panel System LEDs and Button on page 18 Front Panel System LEDs and Buttons The following figure shows the layout of the system LEDs and the power control button on the front panel 7 Hard drive HDD4 18 Hard drive HDD15 8 Hard drive HDD5 19 USB port 2 9 Hard drive HDD6 20 USB port 3 10 Hard drive HDD7 21 SATA DVD module 11 Hard drive HDD8 Figure Legend Continued ...

Страница 23: ...em LEDs and Power Buttons Figure Legend 1 Locator LED and button 5 Power Supply Service Required LED 2 Fault Service Required LED 6 System Overterperature Fault Service Required LED 3 Power OK LED 7 Top Fan Fault Service Required LED 4 Power ON Standby button ...

Страница 24: ...its normal state System power might be off The service processor might be running Steady on System is powered on and is running in its normal operating state No service actions are required Blink System is running in standby mode and can be quickly returned to full operation Slow blink A transitional activity is taking place Fast blink Service processor is booting Power button The recessed Power b...

Страница 25: ...14 Rear Panel System LEDs and Button on page 18 Figure Legend 1 Power supply 0 12 Hole for pressing the physical presence button 2 Power supply 1 13 USB port 0 3 Locator LED button 14 USB port 1 4 Service Required LED 15 VGA video port 5 Power OK LED 16 PCIe slot 3 or XAUI slot 1 6 SP SER MGT port 17 PCIe slot 0 or XAUI slot 0 7 SP NET MGT port 18 PCIe slot 4 8 Gbit Ethernet port NET0 19 PCIe slot...

Страница 26: ...2012 Rear Panel System LEDs and Button The following figure shows location of the system LEDs and the locator button on the rear panel FIGURE Rear Panel System LEDs Figure Legend 1 Locator LED and button 3 Power OK LED 2 Fault Service Required LED ...

Страница 27: ...e are two methods for turning a Locator LED on Issuing the Oracle ILOM command set SYS LOCATE value Fast_Blink Pressing the Locator button Service Required LED amber Steady on light indicates that a fault has been detected in the system and that service is required Power OK LED green Indicates the following conditions Off System is not running in its normal state System power might be off The serv...

Страница 28: ...by static electricity Use a grounded antistatic wriststrap footstrap or equivalent safety equipment to prevent electrostatic damage ESD when you install or service the servers Caution To protect electronic components from electrostatic damage which can permanently disable the system or require repair by service technicians place components on an antistatic surface such as an antistatic discharge m...

Страница 29: ...ge 20 Server Handling Precautions on page 19 Optional Component Installation Optional conponents that are ordered as part of the server s initial configuration will be installed in the server before it is shipped However if you place a separate order for optional components you will need to install them in the server on site See the service manual for instructions on installing optional components...

Страница 30: ...22 SPARC T3 1 Server Installation Guide March 2012 ...

Страница 31: ...Correct Operation of the Slide Rails and the CMA on page 44 Stabilize the Rack Your server rack should include an anti tilt legs that prevent the rack from tipping forward when a server is extended out of the rack Set the anti tilt legs on the server rack before extending slide rails that are supporting a server or before installing a server on extended rails See your rack s documentation for inst...

Страница 32: ... Mount Kit Each screw mount slide rail assembly consists of a three section slide rail and a removable mounting bracket These components can be installed on either side of the chassis FIGURE Sections of the Screw Mount Slide Rail Assembly The middle and rear sections have holes for attaching to the rack posts They adjust to fit rack depths from 24 in 61 cm to 36 5 in 93 cm The front section extend...

Страница 33: ...ket at this point it slides an additional 12 in 30 cm before separating from the slide rail That there are five locks in a slide rail assembly Four are on the mounting bracket One lock is on the front section of the slide rail The locks are described in Installing the Server on page 23 FIGURE Locating the Locks on the Screw Mount Slide Rail Assembly ...

Страница 34: ...ear sections of the slide rails have holes for mounting the rail to the rack posts The front section extends out of the middle section which allows the server to be postioned far enough out of the rack for many service operationsto be performed The removable mounting bracket slides 14 5 in 37 cm out of the slide rail then locks in place If you unlock the mounting bracket at this point it slides an...

Страница 35: ...ly Related Information Install the Screw Mount Slide Rail Assemblies on page 27 Install the Snap In Slide Rail Assemblies on page 34 Install the Screw Mount Slide Rail Assemblies 1 Stabilize the rack by extending its anti tilt legs See your rack documentation for instructions ...

Страница 36: ...s a Simultaneously press and hold the upper and lower lock buttons of the slide rail lock FIGURE Unlocking the Slide Rail Assembly b Pull the mounting bracket out until it locks in the extended position c Slide the mounting bracket release button out in the direction shown then slide the mounting bracket out of the slide rail ...

Страница 37: ...stalling the Server 29 FIGURE Location of the Mounting Bracket Release Button d Press the metal lever labeled Push on the middle section of the sliding rail then push the middle section back into the rack ...

Страница 38: ... Section 3 Attach a mounting bracket to the right side of the chassis a Position the mounting bracket against the chassis Ensure that the slide rail lock is at the front and the three keyed openings on the mounting bracket are aligned with the three locating pins on the side of the chassis ...

Страница 39: ...acket lock 4 Attach the second mounting bracket to the left side of the chassis 5 Determine which rack post holes to use for attaching the slide rails Use the mounting holes that are in line with the lower half of the 2U space 6 Determine which screws you will use to mount the slide rails If your rack has threaded mounting holes in the rack posts determine whether the threads are metric or standar...

Страница 40: ...il until the rear mounting flange reaches the outside edge of the rear rack post c Use two screws to loosely attach the rear of the slide rail to the rear rack post 8 Attach the second slide rail to the left rack posts in a similar manner Do not tighten the screws 9 Use the slide rail spacing tool to adjust the distance between the slide rails a At the front of the rack plug the left side of the t...

Страница 41: ...of the rail to the right or left as needed to allow the ends of the tool to enter the ends of both rails The distance between the rails is now equal to the width of the server with mounting brackets d Tighten the screws to lock the ends of the rails in place e At the rear of the rack repeat Step a through Step d for the rear ends of the rails Related Information Slide Rail Assembly Overview on pag...

Страница 42: ...f their respective slide rails a Simultaneously press and hold the upper and lower lock buttons of the slide rail lock FIGURE Unlocking the Express Rail Slide Rail Assembly b Pull the mounting bracket out until it stops c Slide the mounting bracket release button to the left then slide the mounting bracket completely out of the slide rail ...

Страница 43: ... 2 Attach a mounting bracket to the right side of the server chassis a Position the mounting bracket against the chassis Ensure that the slide rail lock is at the front and the keyed openings on the mounting bracket are aligned with the locating pins on the side of the chassis ...

Страница 44: ...e the mounting bracket toward the front of the chassis until the bracket locks into place with an audible click c Verify that all four locating pins are trapped in the keyed openings and that the third locating pin from the front has engaged the mounting bracket lock 3 Attach the second mounting bracket to the left side of the server chassis 4 Orient the slide rails ensuring that the ball bearing ...

Страница 45: ...7 FIGURE Express Rail Slide Rails Orientation for Installation 5 Extend the slide rails outer section to fit the rack and attach the slide rails to the rack You hear an audible click when the rails securely attach to the rack ...

Страница 46: ...ilt feature on the rack before continuing the installation Related Information Slide Rail Assembly Overview on page 23 Insert and Lock the Server in the Rack 1 Insert the ends of the mounting brackets into the sliding rails Caution The weight of the servers on extended slide rails can be enough to overturn an equipment rack ...

Страница 47: ...edures in this chapter Caution Before continuing verify that the server is securely mounted in the rack and that the slide rails are locked to the mounting brackets 2 If the chassis or rack is equipped with an antitilt bar deploy it 3 Slide the chassis into the rack FIGURE Mounting the Chassis on the Slide Rails Related Information Slide Rail Assembly Overview on page 23 ...

Страница 48: ...n weight until it is secured by all three attachment points 1 Remove the tape from the CMA rail extension on the left of the CMA and remove the CMA rail extension 2 Attach the CMA rail extension to rear left slide rail At the rear of the rack plug the CMA rail extension into the end of the left sliding rail assembly The tab at the front of the rail extension clicks into place ...

Страница 49: ...s called the CMA Connector for Inner Member This extension attaches to the right mounting bracket The larger extension is called the CMA Connector for Outer Member and attaches to the right sliding rail 3 Insert the smaller extension into the clip located at the end of the mounting bracket Slide the smaller extension into the square hole on the middle in width of the clip that is located at the en...

Страница 50: ...42 SPARC T3 1 Server Installation Guide March 2012 FIGURE Mounting the Inner CMA Connector 4 Insert the larger extension into the end of the right sliding rail ...

Страница 51: ...FIGURE Attaching the Outer CMA Connector 5 Insert the hinged plastic connector at the left side of the CMA fully into the CMA rail extension The plastic tab on the CMA rail extension locks the hinged plastic connector in place ...

Страница 52: ... Slide Rail Verify Correct Operation of the Slide Rails and the CMA Perform this procedure both before and after you install the server cables in the CMA Perfoming the procedure before the CMA contains cables helps ensure that it extends and contracts smoothly before the cables are added ...

Страница 53: ... 1 For a free standing rack deploy the antitilt bar 2 Unlock the slide lock buttons at the right and left sides of the chassis FIGURE Unlocking the Slide Rail Assembly 3 If the server cables have been placed inside the CMA inspect them for binding or kinks 4 Slowly pull the server out of the rack until the slide rails reach their stops 5 Verify that the CMA extends fully and does not bind in the s...

Страница 54: ...s toward you simultaneously and slide the server back into the rack The server should slide smoothly into the rack without binding FIGURE Rail Mounting Bracket Release Button 8 Verify that the CMA retracted without binding 9 Adjust the cable straps and CMA as required to secure the cables ...

Страница 55: ... Ethernet network connection NET port The service processor serial management port SER MGT port The service processor network management port NET MGT port A power cable for each power supply Service processor management ports There are two service processor management ports for use with the Oracle ILOM service processor The service processor serial management port labeled SER MGT uses an RJ 45 cab...

Страница 56: ... has completed booting You can connect up to 126 devices to each of the four USB controllers for a total of 504 USB devices per system Power cables Do not attach power cables to the power supplies until you have finished connecting the data cables and have connected the server to a serial terminal or a terminal emulator PC or workstation Note The server goes into Standby mode and the Oracle ILOM s...

Страница 57: ...Port Rear Panel This port is needed to set up the service processor network management port When connecting a DB 9 cable use an RJ 45 to DB 9 adapter to perform the crossovers given for each connector Note Use the service processor serial management port only for server management This port is the default connection between the service processor and a terminal or a computer Caution Do not attach a...

Страница 58: ...nagement Port Rear Panel Note This port is not operational until you configure the network settings through the serial management port Note The service processor network management port is configured by default to retrieve network settings with Dynamic Host Configuration Protocol DHCP and allow connections using Solaris Secure Shell SSH You might need to modify these settings for your network Inst...

Страница 59: ...he rear of the chassis NET0 is the farthest left port in the 4 port network cluster FIGURE Service Processor Ethernet Network Ports Rear Panel 2 Connect Category 5 cables from your network switch or hub to the remaining Ethernet ports NET1 NET2 NET3 as needed Related Information Connecting the Server Cables on page 47 Connect Other I O Cables If your server configuration includes PCIe expansion mo...

Страница 60: ...tart the initialization diagnostics at this point connect only the power supply end of the power cord s Plug the power cords into the power supplies Note Do not connect the power cords to the power sources at this time Doing so will cause you to miss system initialization and diagnostic messages that are output during the power up phase Related Information Connect a Terminal or Emulator to the SER...

Страница 61: ...ting kit screw mount tooled and snap in tool less The CMA clips onto the slide rails Use the velcro straps to secure cabling to the CMA FIGURE Cable Management Arm Related Information Secure the Server Cables in the CMA on page 53 Secure the Server Cables in the CMA 1 Once the server cables are connected and placed inside the CMA open the velcro cable straps and wrap the straps around the CMA secu...

Страница 62: ...Cables With the CMA and Velcro Straps 2 Verify the operation of the slide rails and CMA and cable service loops Repeate the steps described in the procedure Verify Correct Operation of the Slide Rails and the CMA on page 44 Related Information Cable Management Overview on page 53 ...

Страница 63: ...c IP Address to the Service Processor on page 60 Initial Power On Tasks Overview When you power on the server for the first time you must take various steps that are not required in subsequent power on sessions Preparatory step Purpose Connect a terminal or terminal emulator to the SER MGT port This enables logging into the service processor before it has been configured for network access Connect...

Страница 64: ...ork configuration settings using the Dynamic Host Configuration Protocol DHCP and allowing connections using Secure Shell SSH For a more detailed discussion on configuring the system console and connecting terminals refer to the system administration documentation for your server Related Information Connect a Terminal or Emulator to the SER MGT Port on page 57 Power On the Server for the First Tim...

Страница 65: ...nal Connect an Ethernet cable between the server s NET MGT port and the network to which future connections to the service processor and host will be made Related Information Oracle ILOM System Console Overview on page 56 Power On the Server for the First Time on page 57 Power On the Server for the First Time 1 Confirm that you have completed all of the preparations for installation See the instru...

Страница 66: ...on runs diagnostics and initializes the Oracle ILOM firmware After a few minutes the SP login prompt appears on the terminal device The host is not initialized or powered on yet 5 At the terminal device log in to the SP as root with a password of changeme 6 Change the root password 7 Power on the server and redirect the host output to display on the serial terminal device After you start the HOST ...

Страница 67: ... intended use Once the server has been configured and you have changed the default password the server is ready for normal use Related Information Connect a Terminal or Emulator to the SER MGT Port on page 57 Connecting the Server Cables on page 47 Assign a Static IP Address to the Service Processor on page 60 Verify System Functionality After powering on the system for the first time use the Sun ...

Страница 68: ...ce processor This example uses 255 255 255 0 to set the netmask Your network environment subnet might require a different netmask Use a netmask number most appropriate to your environment 5 Use the show SP network command to verify that the parameters were set correctly set SP network pendingipdiscovery static Set pendingipdiscovery to static set SP network pendingipaddress service processor IPadd...

Страница 69: ...ed Related Information Power On the Server for the First Time on page 57 dhcp_server_ip none ipaddress xxx xxx xxx xxx ipdiscovery static ipgateway xxx xxx xxx xxx ipnetmask 255 255 252 0 macaddress xx xx xx xx xx xx pendingipaddress xxx xxx xxx xxx pendingipdiscovery static pendingipgateway xxx xxx xxx xxx pendingipnetmask 255 255 255 0 sidebandmacaddress xx xx xx xx xx xx state enabled Commands ...

Страница 70: ...62 SPARC T3 1 Server Installation Guide March 2012 ...

Страница 71: ...63 Glossary B BMC baseboard management controller C CMA cable management arm D DHCP Dynamic Host Configuration Protocol DTE data terminal equipment E ESD electrostatic discharge ...

Страница 72: ...adapter I ILOM Oracle Integrated Lights Out Manager IP Internet Protocol N NET MGT network management port NIC network interface card or controller O Oracle Solaris OS Oracle Solaris Operation System POST POST power on self test Q QSFP quad small form factor pluggable ...

Страница 73: ...tached SCSI SER MGT serial management port SP service processor SSD sold state drive SSH Secure Shell U UI user interface UUID Universal Unique Identifier W WWID world wide identifier A unique number that identifies a SAS target ...

Страница 74: ...66 SPARC T3 1 Server Installation Guide March 2012 ...

Страница 75: ...brackets 34 locks See slide rail assembly locks M minimum cable connections 47 modem not for use with the SER MGT serial management port 49 mounting bracket locating pins on chassis 34 preparation for installation 34 removing from slide rail 34 unlocking 34 mounting screws for rack 31 P parity for serial terminal no 57 pins mounting bracket locating 34 powering on the system for the first time 55 ...

Страница 76: ... T3 1 Server Installation Guide March 2012 environmental 6 operating environment 11 physical 4 server 4 standby voltage 3 3v 52 58 stop bit 57 U unlocking mounting bracket 34 V VGA DB 15 video port connector 48 ...

Отзывы: