background image

xi

Preface

This guide describes how to install and remove the Sun StorageTek™ 4 Gb Fibre
Channel (FC) Network Express Module (NEM) Host Bus Adapter (HBA), 20-port
pass-through RoHS 5 compliant module. This document is written for technicians,
system administrators, application service providers (ASPs), and users who have
advanced experience troubleshooting and replacing hardware.

How This Document Is Organized

Chapter 1

provides an overview of the product and lists the various operating

systems, host platforms, switches, and storage systems that support the NEM.

Chapter 2

describes how to install and remove the NEM.

Chapter 3

describes how to download and install the HBA drivers and patches.

Chapter 4

contains the latest supplementary information for the preceding chapters.

Appendix A

provides the required product safety information.

Содержание Sun StorageTek SG-XPCIE20FC-NEM-Z

Страница 1: ...sun com Submit comments about this document at http www sun com hwdocs feedback Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide For HBA Model SG XPCIE20FC NEM Z Part No 819 7929 12 F...

Страница 2: ...O BE LEGALLY INVALID Copyright 2008 Sun Microsystems Inc 4150 Network Circle Santa Clara Californie 95054 tats Unis Tous droits r serv s Sun Microsystems Inc poss de les droits de propri t intellectue...

Страница 3: ...form Support 5 Storage System Support 5 Fibre Channel Switch Support 6 2 Hardware Installation and Removal 7 Observing ESD and Handling Precautions 8 Installing the NEM 8 To Install the NEM 9 To Conne...

Страница 4: ...Enterprise Linux 24 Novell SUSE Linux Enterprise Server 24 To Update the Driver 24 To Install SLES9 SP3 to FC Disk 25 To Build the Linux 2 6 Driver 25 Driver Software for Windows 2003 OS 26 To Install...

Страница 5: ...Contents v Declaration of Conformity 33 Safety Agency Compliance Statement 35 Regulatory Compliance Statements 47 Index 51...

Страница 6: ...vi Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 7: ...FIGURE 2 2 Inserting the NEM Into the Chassis 10 FIGURE 2 3 Connecting the Optical Cables 12 FIGURE 2 4 Port Level LEDs 13 FIGURE 2 5 LEDs Attention and Locator Buttons 18 FIGURE 2 6 Location of ID C...

Страница 8: ...viii Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 9: ...Specifications 2 TABLE 1 2 Supported Operating System Versions 4 TABLE 1 3 Platform and Operating System Support 5 TABLE 2 1 Optical Cable Specifications 11 TABLE 2 2 Port LED Indicator Status Defini...

Страница 10: ...x Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 11: ...vanced experience troubleshooting and replacing hardware How This Document Is Organized Chapter 1 provides an overview of the product and lists the various operating systems host platforms switches an...

Страница 12: ...ch as shutting down the system booting the system and configuring devices Refer to the following for this information Software documentation that you received with your system Solaris Operating System...

Страница 13: ...you type when contrasted with on screen computer output su Password AaBbCc123 Book titles new words or terms words to be emphasized Replace command line variables with real names or values Read Chapte...

Страница 14: ...lleged damage or loss caused by or in connection with the use of or reliance on any such content goods or services that are available on or through such sites or resources Sun Welcomes Your Comments S...

Страница 15: ...Preface xv Service Contact Information If you need help installing or using this product call 1 800 USA 4SUN or go to http www sun com service contacting...

Страница 16: ...xvi Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 17: ...un StorageTek 4 Gb FC NEM 20 Port HBA consists of a 20 port NEM bus expansion board that interfaces a FC optical media bus The NEM provides closed chassis adapter installation removal integrated hot p...

Страница 18: ...ription NEM interface PCI Express ten x8 ten x4 active links FC interface Dual port 4 2 1 Gbps auto speed negotiation FC topology Point to point N port Arbitrated Loop NL_port and Switched Fabric N_po...

Страница 19: ...r for the ID chip feature to work the replacement NEM must be running firmware version 2 72a at minimum For information about determining and updating the firmware version see the following Emulex doc...

Страница 20: ...tches that are compatible with the heterogeneous FC network design of the NEM This section contains the following topics Host Platform Support on page 5 Storage System Support on page 5 TABLE 1 2 Supp...

Страница 21: ...Information System Storage System Support The NEM supports the following storage systems Sun StorEdge 3510 and 3511 FC Arrays see Using the NEM With Sun StorEdge 3510 and 3511 Arrays on page 29 Sun S...

Страница 22: ...Gb Brocade SilkWorm 3200 and 3800 switches 2 Gb Brocade SilkWorm 3250 and 3850 switches 2 Gb Brocade SilkWorm 3900 switch 2 Gb Brocade SilkWorm 12000 and 24000 directors 4 Gb Brocade SilkWorm 4100 swi...

Страница 23: ...Sun Blade 8000 Modular System or Sun Blade 8000 P Modular System for the first time follow the installation instructions in the Sun Blade 8000 Series Installation Guide This chapter contains the follo...

Страница 24: ...e the NEM in its antistatic bag until you are ready to install it in the system Always use a properly fitted and grounded wrist strap or other suitable ES protection when handling the NEM and observe...

Страница 25: ...on or service manual to determine an appropriate slot in which to install the NEM 3 Unpack the NEM and remove it from the antistatic bag 4 Locate a vacant NEM slot in the back of the chassis Ensure th...

Страница 26: ...NEM Ejector Levers 6 Align the NEM with the chassis guidance system and slide the NEM into its slot see FIGURE 2 2 Ensure that the NEM engages with the system chassis guidance system Failure to align...

Страница 27: ...ts slot After you physically install the NEM in its slot the Chassis Monitoring Module CMM will automatically detect the presence of the NEM The OK LED goes to Standby blink see TABLE 2 3 for LED stat...

Страница 28: ...n connecting the optical cables 1 Connect each fiber optic cable to an LC connector on the NEM see FIGURE 2 3 The ports are numbered 0 9 right to left as viewed from the back of the chassis Each NIC h...

Страница 29: ...the optical cables are connected to the NEM proceed to Configuring the NEM For Hot Plug Operation on page 14 3 Observe the light emitting diodes LEDs status for the power on self test POST Each port...

Страница 30: ...state link up On 3 Fast blinks 4 Gb Link Rate Normal operating state link up Off Off Wake up failure board failed Off On POST failure board failed Off Slow blink Wake up failure monitor Off Fast blink...

Страница 31: ...displayed 2 In the left navigation pane select CMM The ILOM Version Information page is displayed 3 Select the System Information tab and then the Components tab The Component Management page is disp...

Страница 32: ...a Type this command to prepare a component for a hot insert set CH component return_to_service_action true For example set CH NEM1 return_to_service_action true b Use the show CH component command to...

Страница 33: ...onents in the chassis while the system is running by using a hot plug procedure To insert modules into the chassis while the system is running you need to 1 Physically install the module 2 Verify in o...

Страница 34: ...re_to_remove_status The system returns prepare_to_remove_status Not Ready 4 Verify that the selected NEM has returned the expected feedback See To Verify NEM Status on page 17 To Verify NEM Status See...

Страница 35: ...rily flashes a white light to assist in locating the module You can also activate the Locator LED remotely by executing a command on the CMM TABLE 2 3 NEM LED Status Ready to Remove LED Color Blue Loc...

Страница 36: ...p Patch 1 Download patch 120223 22 or 120222 22 from SunSolve http sunsolve sun com 2 Install the patch onto each of the HBAs in the NEM Follow the installation instructions included in the patch Read...

Страница 37: ...nd at the bottom of the NEM To Replace the ID Chip 1 After you have removed the failed NEM from the chassis locate the ID chip at the back of the board see FIGURE 2 6 FIGURE 2 6 Location of ID Chip 2...

Страница 38: ...ry 2008 a Position the notched side of the ID chip to the left b Place the ID chip directly over the connector c Press down easily to seat the ID chip to the connector FIGURE 2 7 Installing the ID Chi...

Страница 39: ...S on page 26 Configuration and Diagnostic Utilities on page 26 Driver Software for the Solaris OS The latest HBA driver for the Solaris OS is included with Solaris 10 patch 120223 22 See Operating Sys...

Страница 40: ...Linux RHEL 4 U3 and U4 supports the NEM No additional driver updates are required Novell SUSE Linux Enterprise Server The HBA driver distributed with SUSE Linux Enterprise Server 9 Service Pack 3 SLES...

Страница 41: ...the Emulex or Novell support web site Emulex web site http www emulex com sun support nem e11000 jsp Novell web site http forgeftp novell com driver process pub update SUN sle9 DUD emulex8 0 16 27 To...

Страница 42: ...un support nem e11000 jsp 2 Locate the driver section for Windows 3 Download the Driver Kit by clicking the Download icon 4 Click the PDF Manual icon to download installation configuration and trouble...

Страница 43: ...Enable or disable the system BIOS Run diagnostic tests on HBAs Manage out of band HBAs Manage local and in band remote HBAs See the Linux or Windows OS Emulex user manual for more information about us...

Страница 44: ...28 Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 45: ...Edge 3510 RAID array or Sun StorEdge 3511 FC with SATA RAID array to the NEM on the same channel that use different speeds 1 Gb and 2 Gb You can however mix 1 Gb and 2 Gb FC HBAs on different controll...

Страница 46: ...see BIOS Option ROMs in the Sun Blade 8000 Series Online Information System For information about how to boot from a FC storage device connected to the NEM see Appendix A in the Sun Blade 8000 Series...

Страница 47: ...ce and Safety Statements This appendix contains the following information that applies to the Sun StorageTek 4 Gb FC NEM 20 Port HBA Declaration of Conformity on page 33 Safety Agency Compliance State...

Страница 48: ...32 Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 49: ...Line Gnd 0 5 kV DC Power Lines IEC 61000 4 6 3 V IEC 61000 4 8 1 A m IEC 61000 4 11 Pass Safety This equipment complies with the following requirements of Low Voltage Directive 73 23 EEC EC Type Exami...

Страница 50: ...34 Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 51: ...personal injury if touched Caution Hazardous voltages are present To reduce the risk of electric shock and danger to personal health follow the instructions Depending on the type of power switch your...

Страница 52: ...essible Do not connect the power cord when the power supply has been removed from the system chassis The following caution applies only to devices with multiple power cords Caution For products with m...

Страница 53: ...controls adjustments or the performance of procedures other than those specified herein may result in hazardous radiation exposure Conformit aux normes de s curit Veuillez lire attentivement cette se...

Страница 54: ...difi Positionnement d un produit Sun Attention Evitez d obstruer ou de recouvrir les orifices de votre produit Sun N installez jamais un produit Sun pr s d un radiateur ou d une source de chaleur Si v...

Страница 55: ...rrect Pour les syst mes dont les batteries sont rempla ables effectuez les remplacements uniquement selon le mod le du fabricant ou un mod le quivalent recommand par le fabricant conform ment aux inst...

Страница 56: ...s radiations dangereuses Einhaltung sicherheitsbeh rdlicher Vorschriften Lesen Sie vor dem Ausf hren von Arbeiten diesen Abschnitt Im folgenden Text werden Sicherheitsvor kehrungen beschrieben die Sie...

Страница 57: ...twicklung im Einklang mit ISO 9296 A bewertet in Betrieb und im Ruhezustand SELV Konformit t Der Sicherheitsstatus der E A Verbindungen entspricht den SELV Anforderungen Anschluss des Netzkabels Achtu...

Страница 58: ...ie Batterien entsprechend den Anweisungen des Herstellers und den vor Ort geltenden Vorschriften CPU Karten von Sun verf gen ber eine Echtzeituhr mit integrier ter Lithiumbatterie Diese Batterie darf...

Страница 59: ...descargas el ctricas o da os en el equipo S mbolos En este documento aparecen los siguientes s mbolos Precauci n Existe el riesgo de que se produzcan lesiones personales y da os en el equipo Siga las...

Страница 60: ...este producto funciona solamente como un dispositivo de espera El cable de alimentaci n hace las veces de dispositivo de desconexi n principal del sistema Aseg rese de que conecta el cable de aliment...

Страница 61: ...eratura m xima no sea superior a la temperatura ambiente establecida como adecuada para el producto Precauci n Para evitar que se alcance una temperatura de funcionamiento extrema debido a una circula...

Страница 62: ...e ved fejlagtig h ndtering Udskiftning m kun ske med batteri af samme fabrikat og type Lev r det brugte batteri tilbage til leverand ren Suomi Varoitus Paristo voi r j ht jos se on virheellisesti asen...

Страница 63: ...a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial env...

Страница 64: ...ek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008 BSMI Class A Notice The following statement is applicable to products shipped to Taiwan and marked as Class A on the product complian...

Страница 65: ...latory Compliance Statements 49 CCC Class A Notice The following statement is applicable to products shipped to China and marked with Class A on the product s compliance label Korean MIC Class A State...

Страница 66: ...50 Sun StorageTek 4 Gb FC NEM 20 Port Host Bus Adapter User s Guide February 2008...

Страница 67: ...n of Conformity 33 diagnostics 26 E electrostatic discharge ESD handling precautions 8 ESD wrist strap 8 F FC switches 6 Fibre Channel topology 2 firmware CMM 5 service processor 5 update 26 H HBA dri...

Страница 68: ...ches required Solaris 4 PCI transfer rate 2 port LEDs 13 port numbering 11 POST failure 13 power on self tests BIOS 30 NEM 12 R ready to remove status 18 regulatory compliance statements 47 Restrictio...

Отзывы: