background image

2

1. Unpack the server, and check that you received all of the shipping contents.

2. Place the server in its intended location for verification.

For rackmounting instructions, refer to the instructions included with the rail kit, the service label on the server, and to
the online

Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide

.

3. Connect a serial cable between the server’s SER MGT port (

FIGURE 2

) and a terminal device.

This connection provides your initial communication with the service processor (SP).
The terminal device can be a terminal, a terminal server, or a laptop with terminal emulation software running. The
device must be set up to communicate using 9600 baud, 8 bit, no parity, 1 stop bit. A null modem configuration is needed,
meaning the transmit and receive signals are reversed (crossed over) for DTE to DTE communications. You can use the
supplied RJ-45 crossover adapters with a standard RJ-45 cable to achieve the null modem configuration.

FIGURE 2

Server Connections

4. (Optional) Connect an Ethernet cable between the server’s Net MGT port (

FIGURE 2

) and the network to which future

connections to the SP and host will be made.

After the initial configuration of the system using the SP SER MGT port, communication with the SP and host is usually
performed through this Ethernet interface.

5. Connect an Ethernet cable between one of the server’s NET ports (

FIGURE 2

) and the network to which the server will

communicate.

Numbered cables

correspond to setup steps.

n

(Optional)

Содержание SPARC Enterprise T5240

Страница 1: ...n times vary but if you are performing these setup instructions for the first time plan to spend about 45 to 75 minutes to complete all of these instructions Additional time might be required for installing optional hardware and rackmounting kits Gather your configuration information During the configuration you are prompted for time zone and networking parameters that are specific to your environ...

Страница 2: ...et up to communicate using 9600 baud 8 bit no parity 1 stop bit A null modem configuration is needed meaning the transmit and receive signals are reversed crossed over for DTE to DTE communications You can use the supplied RJ 45 crossover adapters with a standard RJ 45 cable to achieve the null modem configuration FIGURE 2Server Connections 4 Optional Connect an Ethernet cable between the server s...

Страница 3: ...P prompt is displayed At this point there are many commands you can perform using the Integrated Lights Out Manager interface Additional SP information such as how to change the password and how to set up the SP network parameters is available in the online documentation set 8 Power on the server and redirect the host output to display on the serial terminal device After you start the SP console t...

Страница 4: ...e network interfaces that you plan to configure If you are not sure select the first one in the list DHCP Select Yes or No according to your network environment Host Name Enter the host name for the server IP Address Enter the IP address for this Ethernet interface Subnet Select Yes or No according to your network environment Subnet Netmask If subnet was Yes Enter the netmask for the subnet for yo...

Страница 5: ...p www sun com software preinstall CoolThreads Overview access to Cool Tools http www sun com servers coolthreads tnb index jsp CoolThreads CMT Tuning and Resources http www sun com servers coolthreads tnb t2 jsp Technical Support If you have technical questions about this product that are not answered in this document go to http www sun com service contacting Documentation Feedback Submit comments...

Страница 6: ...ED provided technical input and review on portions of this material Copyright 2008 2010 Oracle et ou ses affiliés Tous droits réservés Entrée et revue tecnical fournies par FUJITSU LIMITED sur des parties de ce matériel Part No 820 3521 11 Rev A July 2010 Bar Code Area Delete this text ...

Отзывы: