6-1
C H A P T E R
6
Removing and Replacing Hot-
Swappable Subassemblies
Following are the hot-swappable subassemblies in the Netra CT 820 server:
■
6.1, “Removing and Installing Power Supplies” on page
■
6.2, “Removing and Installing Fan Trays” on page
■
6.3, “Removing and Installing the Air Filter” on page
6.1
Removing and Installing Power Supplies
The Netra CT 820 server accommodates up to eight 250W modular power supplies.
The power supplies are load sharing, and hot-swappable, and plug directly into the
power trays (
The number of power supplies needed in any given system depends on the load in
that system. Every Netra CT 820 server is shipped out with eight power supplies;
this is the suggested number of power supplies to ensure complete power supply
redundancy in your system.
Caution –
Power supply maintenance should only be performed by trained
personnel. When the system is plugged in, energy hazards are present on the
midplane. Do not reach into the enclosure.
Caution –
All power supplies must be of identical make and model. If changing
make or model, power must be removed from the chassis and all supplies must be
replaced.
Содержание Netra CT 820
Страница 7: ...Contents vii Index Index 1...
Страница 8: ...viii Netra CT 820 Server Service Manual July 2004...
Страница 18: ...xviii Netra CT 820 Server Service Manual July 2004...
Страница 22: ...1 4 Netra CT 820 Server Service Manual July 2004...
Страница 28: ...2 6 Netra CT 820 Server Service Manual July 2004...
Страница 46: ...4 16 Netra CT 820 Server Service Manual July 2004...
Страница 72: ...6 8 Netra CT 820 Server Service Manual July 2004...
Страница 80: ...7 8 Netra CT 820 Server Service Manual July 2004...
Страница 84: ...8 4 Netra CT 820 Server Service Manual July 2004...
Страница 118: ...A 34 Netra CT 820 Server Service Manual July 2004...
Страница 128: ...Glossary 4 Netra CT 820 Server Service Manual July 2004...
Страница 132: ...Index 4 Netra CT 820 Server Service Manual July 2004...