The “Maintenance” section of this manual is divided into three main sub-
sections:
- Operator initiated system checks.
- Routine maintenance procedures.
- Error codes and warnings.
9.1 System Checks
The operator may initiate the following system checks:
-
-
-
-
Check and/or Install the O2 Cell
All the above checks are initiated via the
9.2 Leak Check (Vacuum)
Note:
A daily check of the gas analyser pneumatic circuit for air leaks that
could compromise the accuracy of the test results is a mandatory
requirement of many country specific test procedures (see
). If the DGA 5000 is configured for an approval type that
requires such a daily leak check, the appropriate settings will be made at
the time of the installation of the test software. In this case the unit will
not commence normal operation unless a satisfactory leak check has
been carried out. In order to ensure the continued accuracy of the test
results, it is recommended that a daily leak check be carried out at the
start of the day‟s operation even in cases where such a test is not a
statutory requirement. To conduct a Leak Check (Vacuum):
•
Select the “Leak Check (Vacuum)” option from the
52
9
Maintenance
Содержание DGA 5000
Страница 1: ...EMISSIONS DIAGNOSTIC PLATFORM Operator s Manual HIGH TECH SECURES YOUR FUTURE...
Страница 2: ......
Страница 5: ......
Страница 9: ...vi...
Страница 13: ...4 C H A P T E R 1...
Страница 15: ...6 C H A P T E R 2...
Страница 24: ...15 C H A P T E R 4...
Страница 46: ...37 C H A P T E R 7...
Страница 81: ...C H A P T E R 10 MAINTENANCE 72...
Страница 84: ......