background image

- 8 -

E

EX

XC

CE

ELL  N

NE

E    IIn

nsstta

alllla

attiio

on

n

Space 
Required  and other
Installation
Considerat-ions

Vent Pipe
Location

Inlet Coupling

1)Compost will be removed from the finishing drawer. Ensure that there is at least 15” in front of

the EXCEL NE so that the drawer may be removed from the unit.

2) Install the unit in a location where the safety drain can be connected. This drain exits from the

back of the unit and must slope downward at all points. THE DRAIN IS REQUIRED  PRIOR  TO

OPERATION.

3) Install in a location where the vent pipe can be attached as per the instructions listed below.
4) Install in a location that is not air tight.
5) Competing appliances (ie. wood stove) may need a air intake installed from the outdoors. The EXCEL 

NE has a passive vent. Competing appliances draw alot of air and may cause your composting toilet 
vent to draw air into the building rather than venting to the outside. A 12 volt fan will be required.

6) Bends in the vent, installation near hills or overhanging trees may cause downdraft. A 12 volt fan may

be required.

1) All vent should be vertically installed.
2) Limit bends in the vent stack to no more than 2 - 45 ° bends.

THERE SHOULD  BE NO HORIZONTAL SECTIONS  OF VENT.

3)  INSTALL VENT SO THAT IT TERMINATES 24”  -  30”  ABOVE

HIGHEST PEAK  OF THE ROOF.    If the vent is being installed on
a steeply pitched roof where snow shear may occur; Install a
heavier pipe through the roof and feed the enclosed vent 
through the heavier pipe. Seal between the pipes with 
expanding foam or other such water-tight material. The 
heavier pipe should be able to withstand  the weight of
sliding snow.

4)  If there is more than 36” of vent needed above the roof line

to reach 24-30” above the highest  peak of the roof(diffusor
included in measurement), use guy wires to secure the vent
above the roof.

5)  The vent must be installed separately from ALL other 

household vents. Venting  cannot be  merged  with other 
venting. Doing so will prevent the unit from operating 
odorlessly.

6)  All connectors in the vent pipe should be sealed. Use  silicone

caulking  to  seal  the  connections.  

7) The diffusor should be glued vertically on to the top of the 

vent pipe. This assembly helps draw air up the vent pipe.

Place the vent inlet coupling into the hole for the 4” vent so that
the 1” of smaller diameter pipe is protruding into the hole in the
top of the unit. This is the first piece of the venting. Once you
have finished assembling the vent, you should run a bead of sili-
cone around the inlet coupling to prevent odor from escaping.

Содержание Excel CSEL-01001

Страница 1: ...quid containment odours and solid end products in both residential and cottage use RATED CAPACITY Residential Continuous Use EXCEL 3 Adults or a family of 5 or EXCLE NE Units 2 Adults or families of 3...

Страница 2: ...hite 115 V CSEL 01001 230 Excel Bone 230 V CSEL 01001W 230 Excel White 230 V CSNL 01101B Excel NE Bone CSNL 01101W Excel NE White CSEM 01400B Compact Bone CSEM 01400WB Compact White CSEM 01400BB Compa...

Страница 3: ...on n Space requirements Vent Piping Location Leading the vent through the Roof The Diffusor Drain Installation Handling Effluent Start Up and Use Ongoing Toilet Maintenance 2 3 3 3 3 4 4 4 4 4 5 7 5...

Страница 4: ...res below 55 F 13 C additional heat is required if the composting toilet will be used continually or frequently If used for intermittent cottage application 3 4 weekends throughout the cold season no...

Страница 5: ...provides the necessary mass to maintain good compost and allows easy aeration of the compost by simply turning the drum Excess liquid will exit through a screen in the bottom of the drum into the eva...

Страница 6: ...s s iis s h ho ow w y yo ou u w wiillll r ro ot ta at te e t th he e d dr ru um m d du ur riin ng g r re eg gu ulla ar r o op pe er ra at tiio on n ii Pull the drum locker button located under the foo...

Страница 7: ...Installation EXCEL and EXCEL NE ROUGH IN DIMENSIONS COMPACT ROUGH IN DIMENSIONS 5...

Страница 8: ...s exposed to the outside or in a non heated space should be insulated if using the unit during cold weather 3 INSTALL VENT SO THAT IT TERMINATES 24 30 ABOVE HIGHEST PEAK OF THE ROOF 4 If you will be i...

Страница 9: ...pipe The diffusor design encourages updraft and discourages wind and weather from going down the vent stack We do not recommend installing anything else on the top of the vent as it could impede the...

Страница 10: ...nds THERE SHOULD BE NO HORIZONTAL SECTIONS OF VENT 3 INSTALL VENT SO THAT IT TERMINATES 24 30 ABOVE HIGHEST PEAK OF THE ROOF If the vent is being installed on a steeply pitched roof where snow shear m...

Страница 11: ...usor design encourages updraft and discourages wind and weather from going down the vent stack We do not recommend installing anything else on the top of the vent as it could impede the venting Unlike...

Страница 12: ...seat The Self Contained toilet is now ready for use Step 4 For electric units only The fan will run continuoulsy 24 hours per day 120 Volt Use Plug it in to a three prong electrical outlet 240 Volt Us...

Страница 13: ...be open under the toilet seat ready to receive waste A Ad dd d o on ne e s sc co oo op p o of f M Miic cr ro ob be e M Miix x to the patented bio drum to recharge the pile This will help to ensure yo...

Страница 14: ...d for 3 4 weekends throughout the winter season then it is considered occasional use All of the same considerations should be taken with these units to winterize them When the temperature dips below 5...

Страница 15: ...e counter clockwise until the handle hits a hard stop Open the drawer and use your rake to level the com post Compost should now be allowed to rest in the drawer for 3 4 weeks to finish the composting...

Страница 16: ...We do not recommend adding kitchen or garden scraps 1 To eliminate flies you can use any pesticide that is used on your garden Pesticides used for garden use are not anti bacterial so are safe to use...

Страница 17: ...t is installed above the peak of the roof If not extend the vent Guide wires may be necessary 2 Add lime to the evaporation chamber as much as you think necessary You will have to rake more often if y...

Страница 18: ...through the overflow drain by tipping the unit up make sure overflow is hooked up first 1 Rake peat moss away from the safety drains This is the build up area If drains are still clogged proceed to s...

Страница 19: ...ions are included with the replacement part Check fuse located on the electric box to ensure that it is functioning correctly If the wire in the fuse is chared or broken Replace the fuse Rotate EXCEL...

Страница 20: ...ift the toilet seat Turn the handle 3 revolutions to bring the drum screen to the top of the drum Access can be gained by reaching through the hole under the toilet seat Spray the drum screen with Com...

Страница 21: ...Sun Mar composting toilet and toilet systems Microbe Mix also contains citronella to discourage insects 5 50 00 0g g 1 16 6 o oz z jja ar r w wiit th h s sc co oo op p Bulking material containing a m...

Страница 22: ...16 Aluminum Sheet 26 Nylon Drive Gear 7 Compact Drum 17 Thermostat 27 Fan Motor Kit 8 Drum Locker Release 18 Heating Element 28 Toilet Seat Screw 9 Front Bearing Plate 19 Electric Box E Elle ec ct tr...

Страница 23: ...ment Electric 20 Nylon Drive Gear 5 Plastic Drum Door 13 Electric Box Electric 21 EXCEL Top 6 EXCEL Tank 14 Thermostat Assembly Electric 22 Fan Assembly Electric 7 Footrest Channel 15 Emergency Drain...

Страница 24: ...ge or failure resulting from failure of the purchaser to follow normal operating procedure outlined in the Owner s Manual or in any other printed instructions 4 Labour and service charges incurred in...

Отзывы: