background image

CENTREX 2000 SPECIFICATIONS

CENTREX 2000 EXPLOSION DIAGRAM & PART NUMBERS

Electrical Specification         115V                240V     

Maximum Amps

3.6                  1.69

Fan Watts

35 req.

35 req.

(Required)
Heater Watts

370                  370       

(When on) 
Average Power Use            200                  200       
In Watts (Heater on         

1/2 time)    

1

PP Cover Plate

11

Drain Assembly                            

21

Drum Locker Knob     

2

Access Port

12

Centrex 2000 Drawer

22

Air Intake Vent         

3

Bushing Threaded                      

13

Electric Box Assembly    (Electric)    

23

Centrex 2000 Tank 

4

Nylon Drive Gear

14

Centrex 2000 Heater Tray

24

Drum Bearing Strip                   

5

SS Shaft Kit                               

15

Rubber U Channel                         

25

Drum Screen

6

Fan Assembly (Electric)               

16

Insulation                                    

26

Drum Door

7

Rubber Gasket                           

17

Thermostat                                 

27

Drum Door  

8

Centrex 2000 Drum                    

18

Heating Element                          

28

Swivel Handle 

9

Bearing Plate                             

19

Aluminum Sheet                           

29

Centrex 2000 Top Kit  

10

Rubber U Channel                       

20

Drum Locker                               

30          

Pipe Piece Inlet NE 4"

- 20 -

Содержание CENTREX 2000

Страница 1: ...ard 41 Certified for liquid containment odours and solid end products in both residential and cottage use RATED CAPACITY Residential Continuous Use CENTREX 2000 Electric Units 4 Adults CENTREX 2000 NE...

Страница 2: ...Models for which the manual applies CCEB 02510 Centrex 2000 115V CCNB 02540 Centrex 2000 NE CCEB 02515 Centrex 2000 230V Metal tools will damage the body of the unit...

Страница 3: ...fluent Installing the waste pipe Installing the Ultra Low Flush Toilet Start Up and Use Ongoing Toilet Maintenance 2 3 3 3 3 4 4 4 4 4 5 7 5 6 6 6 6 7 7 7 8 8 8 8 8 8 9 9 10 11 Spring Time Start Up Wi...

Страница 4: ...C additional heat is required if the composting toilet will be used continually or frequently If used for intermittent cottage application 3 4 weekends throughout the cold season no additional heat is...

Страница 5: ...aeration of the compost by simply turning the drum Excess liquid will exit through a screen in the bottom of the drum into the evaporation chamber Mixing the Bio drum is accom plished by rotating the...

Страница 6: ...rum door closes This is how you will rotate the drum during regular operation ii Lift and remove the access door and rotate the drum until the drum opening is visible through the the access door openi...

Страница 7: ...Installation CENTREX 2000 ROUGH IN DIMENSIONS 5...

Страница 8: ...ed roof where snow shear may occur Install a heavier pipe through the roof and feed the enclosed vent through the heavier pipe Seal between the pipes with expandable foam or other such water tight sub...

Страница 9: ...HE ROOF If the vent is being installed on a steeply pitched roof where snow shear may occur Install a heavier pipe through the roof and feed the enclosed vent through the heavier pipe Seal between the...

Страница 10: ...ound the vent pipe where it emerges from the building The diffusor provided with the unit is a simple device to be installed at the top of the vent stack with the larger pipe pro truding above the sma...

Страница 11: ...ervicing or other reasons should this ever be required vi Insulate pipe if unit is to be used during the winter 1 Make sure the center of the floor flange is at least 11 inches 280mm from the back wal...

Страница 12: ...must remain open under the waste pipe The CENTREX 2000 is now ready for use Step 4 For electic units only The fan will run continuously 24 hours per day 120 Volt Use Plug it in to a three prong elect...

Страница 13: ...le This will help to ensure your microbe colony stays constant and healthy Rake the evaporation chamber Remove the finishing drawer Rake any solid debris from the floor of the unit under the drawer ev...

Страница 14: ...ason then it is considered occasional use All of the same consid erations should be taken with these units to winterize them When the temperature dips below 55 F 13 C composting activity will decrease...

Страница 15: ...top Open the drawer and use your rake to level the compost Compost should now be allowed to rest in the drawer for 3 4 weeks to finish the composting process The drum lock button is attached to a bar...

Страница 16: ...iminate flies you can use any pesticide that is used on your garden Pesticides used for garden use are not anti bacterial so are safe to use on your compost 2 The alternative to using pesticides is to...

Страница 17: ...de wires may be necessary 2 Add lime to the evaporation chamber as much as you think necessary You will have to rake more often if you do this 3 SUN MAR has a filter box available which will filter th...

Страница 18: ...n by tipping the unit up make sure overflow is hooked up first 1 Rake peat moss away from the safety drains This is the build up area If drains are still clogged proceed to step 3 2 Check drain line f...

Страница 19: ...the heating element has failed Have your serial number ready and call SUN MAR for a replacement Detailed instructions are included with the replacement part Check fuse located on the electric box to...

Страница 20: ...add one scoop of Microbe Mix every second week and ensure that the drum is not more than full Bi Monthly maintenance and emptying cycle Rake out evaporation chamber with rake provided the area below...

Страница 21: ...ing material containing 100 chopped hemp stalk to provide moisture retention porosity and free air space within the compost 30 litre 8 USG bag DC Vent Kit Kit required for conversion of electric units...

Страница 22: ...ort 12 Centrex 2000 Drawer 22 Air Intake Vent 3 Bushing Threaded 13 Electric Box Assembly Electric 23 Centrex 2000 Tank 4 Nylon Drive Gear 14 Centrex 2000 Heater Tray 24 Drum Bearing Strip 5 SS Shaft...

Страница 23: ...ms 3 Damage or failure resulting from failure of the purchaser to follow normal operating procedure outlined in the Owner s Manual or in any other printed instructions 4 Labour and service charges inc...

Отзывы: