Summit Z Beam Shelving Скачать руководство пользователя страница 8

100

 

 

102

 

Kirkham

 

Rd

 

West,

 

Keysborough,

 

3173

 

VIC

 

Ph:

 

1800

 

352

 

999

 

W:

 

www.summit.com.au

 
 

 

 

Step

 

1.5

 

 

Position

 

the

 

workbench

 

in

 

final

 

location

 

then

 

lay

 

shelf

 

decks

 

on

 

top

 

of

 

the

 

beams

 

as

 

per

 

diagram

 

12.

 

 

Diagram

 

12

 

 

 

 

Step

 

1.6

 

 

Secure

 

the

 

two

 

bays

 

by

 

aligning

 

the

 

middle

 

uprights

 

and

 

firmly

 

clamping

 

together

 

with

 

a

 

post

 

clip

 

as

 

per

 

diagram

 

13.

 

Do

 

this

 

for

 

front

 

and

 

back.

 

Finish

 

the

 

unit

 

by

 

inserting

 

post

 

caps

 

on

 

the

 

top

 

of

 

the

 

uprights.

 

 

Diagram

 

13

 

 

 

Содержание Z Beam Shelving

Страница 1: ...r Helpful Hints Use a cloth or wooden block to protect the components when hammering Hammer gently to avoid component damage Drive rivets to the bottom of the keyhole by striking the beam near the joi...

Страница 2: ...u have all the parts listed Step 2 Join two uprights with a short beam to form a bottom end frame as per diagram 1 Drive the rivets to the bottom of the keyhole by hitting the beam near the joint with...

Страница 3: ...eat step 2 to create a second bottom end frame and then join the two bottom end frames together with long beams as per diagram 2 Diagram 2 Step 4 Create a top end frame by joining two uprights with a...

Страница 4: ...tom end frames using post joiners as per diagram 4 A second person to hold the top end frames steady at this point is advised Diagram 4 Step 7 Insert a short beam to the mid section of the top and bot...

Страница 5: ...999 W www summit com au Step 8 Add two long beams to the top of the unit as per diagram 6 Diagram 6 Step 9 Assemble the remaining long and short beams to create two additional shelf levels as per diag...

Страница 6: ...into final position and then lay the shelf decks on top of the beams as per diagram 8 Work from the bottom up Insert post caps on the top and bottom of the uprights Diagram 8 It is recommended that y...

Страница 7: ...iddle shelf level can be set to desired height Diagram 9 Step 1 3 Build the secondary bay end frame as per diagram 10 Please note that for stability the bottom shelf level needs to be in the 7th and 8...

Страница 8: ...final location then lay shelf decks on top of the beams as per diagram 12 Diagram 12 Step 1 6 Secure the two bays by aligning the middle uprights and firmly clamping together with a post clip as per...

Отзывы: