Summit Z Beam Shelving Скачать руководство пользователя страница 7

100

 

 

102

 

Kirkham

 

Rd

 

West,

 

Keysborough,

 

3173

 

VIC

 

Ph:

 

1800

 

352

 

999

 

W:

 

www.summit.com.au

 
 

 

Step

 

1.1

 

 

Create

 

a

 

bottom

 

assembly

 

as

 

per

 

steps

 

2

 

and

 

3.

 

 

Step

 

1.2

 

 

Finish

 

the

 

main

 

workbench

 

bay

 

as

 

per

 

diagram

 

9.

 

Middle

 

shelf

 

level

 

can

 

be

 

set

 

to

 

desired

 

height.

 

 

Diagram

 

9

 

 

 

 

Step

 

1.3

 

 

Build

 

the

 

secondary

 

bay

 

end

 

frame

 

as

 

per

 

diagram

 

10.

 

Please

 

note

 

that

 

for

 

stability

 

the

 

bottom

 

shelf

 

level

 

needs

 

to

 

be

 

in

 

the

 

7

th

 

and

 

8

th

 

keyhole

 

as

 

illustrated.

 

 

Diagram

 

10

 

 

 

Step

 

1.4

 

 

Complete

 

the

 

secondary

 

bay

 

by

 

repeating

 

step

 

1.3

 

to

 

form

 

a

 

second

 

end

 

frame

 

and

 

then

 

joining

 

together

 

with

 

long

 

beams

 

as

 

per

 

diagram

 

11

 

 

Diagram

 

11

 

 

 

 

 

 

 

 

 

 

 

Содержание Z Beam Shelving

Страница 1: ...r Helpful Hints Use a cloth or wooden block to protect the components when hammering Hammer gently to avoid component damage Drive rivets to the bottom of the keyhole by striking the beam near the joi...

Страница 2: ...u have all the parts listed Step 2 Join two uprights with a short beam to form a bottom end frame as per diagram 1 Drive the rivets to the bottom of the keyhole by hitting the beam near the joint with...

Страница 3: ...eat step 2 to create a second bottom end frame and then join the two bottom end frames together with long beams as per diagram 2 Diagram 2 Step 4 Create a top end frame by joining two uprights with a...

Страница 4: ...tom end frames using post joiners as per diagram 4 A second person to hold the top end frames steady at this point is advised Diagram 4 Step 7 Insert a short beam to the mid section of the top and bot...

Страница 5: ...999 W www summit com au Step 8 Add two long beams to the top of the unit as per diagram 6 Diagram 6 Step 9 Assemble the remaining long and short beams to create two additional shelf levels as per diag...

Страница 6: ...into final position and then lay the shelf decks on top of the beams as per diagram 8 Work from the bottom up Insert post caps on the top and bottom of the uprights Diagram 8 It is recommended that y...

Страница 7: ...iddle shelf level can be set to desired height Diagram 9 Step 1 3 Build the secondary bay end frame as per diagram 10 Please note that for stability the bottom shelf level needs to be in the 7th and 8...

Страница 8: ...final location then lay shelf decks on top of the beams as per diagram 12 Diagram 12 Step 1 6 Secure the two bays by aligning the middle uprights and firmly clamping together with a post clip as per...

Отзывы: