10
Installing the tap handle and beer tap
Screw the tap handle clockwise into the beer tap and connect the tap to the beer tower components
and tighten it with a wrench.
Installing the Upper Cover Guardrail and Drip Tray
Set the upper cover guardrail and drip tray on top of the beer dispenser.
Notes:
•
When replacing the beer keg, first turn off the safety switch on the CO2 regulator valve and
remove the mixed ball valve to take out the keg.
•
When replacing the CO2 gas cylinder, remember to turn off the main switch of the CO2 gas
cylinder and the safety switch on the CO2 regulator valve. Afterward, use a wrench to loosen
the hexagonal nut port connecting the CO2 regulator valve with the CO2 tank. Then, using a
wrench, remove the fixed bolt of the CO2 tank to take out the CO2 tank.
•
During the installation process, be sure that all parts are connected tightly and that there are no
gas leaks.
•
When connecting the hose to the connection port, you can dip the ends into warm water to
make the connection easier.
•
If the high-pressure compressed gas in the CO2 tank is not handled properly, it could be
dangerous:
o
Make a note of the D.O.T. testing date on the cylinder neck before installation. If it is more
than 5 years old,
don’t use the product. Return it to the gas supplier.
o
Keep gas cylinder away from heat sources. Unused cylinders should be placed upright in a
cool, ventilated place (preferably at 70
ᵒF).
NOTE: TEST FOR CO
2
LEAKS AFTER EACH FITTING, WITH A
MIXTURE OF SOAP AND WATER
Содержание LWBC30
Страница 14: ...14 NOTES...
Страница 15: ...15 NOTES...