background image

Safety Section 

 

 
 
 
 
 
 
 
 
 
 
 

 

Refer to OSHA 1910.132 

(Personal Prot. Equip.)

 

To avoid electric shock or electrocution, all 
equipment must be properly wired and grounded 
according to electrical codes. Have unit wired by 
qualified electrician. 

 
Have an electrician install a main power disconnect 
switch capable of being locked only in OFF position. 
Mark disconnect 
clearly as to 
equipment it 
operates. 
Always lock out 
main power 
disconnect 
switch whenever 
equipment is not 
in use. 

 

 

WARNING: When servicing equipment, never 
enter bin unless all power is locked out and 
another person is present. Always LOCK OUT 

all power and always check with voltage meter before 
servicing. 
 
Failure to do so could result in death or serious injury. 
 
Owners/operators are responsible for developing 
site-specific Lockout/Tagout procedures based on 
equipment at their work site. See 

OSHA’s typical 

minimal lockout procedures (29CFR 1910.147 App A) 
at www.osha.gov. 

 

 

WARNING: KEEP CLEAR OF ALL MOVING 
PARTS

Keep people (ESPECIALLY YOUTH) away from 
equipment, particularly during operation. 
 
Keep away from all moving parts. 
Keep all shields in place. SHUT 
OFF AND LOCK OUT
 all power 
before servicing. 
 
Failure to follow precautions above 
could result in death or serious 
injury. 
 

WARNING:  Metal is slippery when wet. To 
avoid falls, never carry items if climbing on 

bin. Maintain secure hand and foothold if climbing on 
bin. Failure to do so could result in death or serious 
injury. 

 

 

CAUTION: Metal edges are sharp. To avoid 
injury, wear protective clothing and handle 
equipment and parts with care. 

 
Failure to do so may result in minor or moderate injury. 

 

 

PERSONAL PROTECTIVE EQUIPMENT 

Owners/Operators are 
responsible for developing 
site-specific personal 
protective equipment 
standards. OSHA’s 
personal protective 
equipment standards 
(29CFR 1910.132) can be 
found at www.osha.gov. 

 
 
 
 
 
 

EMERGENCIES – KNOW WHAT TO DO 

Have emergency numbers and written directions to 
work site readily available in case of emergency. An 
area for emergency phone numbers to be recorded is 
provided below and at end of this manual. 
 

Ambulance • Fire • Police: 9-1-1 

Bin rescue team: _______________________

 

Emergency medical squad: ______________ 

Address of work site: ___________________ 

Directions to work site:__________________

 

 

Содержание Spredway

Страница 1: ...acturing Co 1555 255th Street Box 677 Sheffield Iowa USA 50475 0677 Phone 641 892 4222 Fax 641 892 4629 Website www sukup com E mail info sukup com Manual L1431 Sukup Manufacturing Co 12 05 2017 DATES...

Страница 2: ...ting from improper management during drying or storage Limited Warranty 3 Safety Section 4 Assembly 7 Installation 8 Operation 10 Troubleshooting Guide 10 Specifications 11 Wiring 11 Optional Pre Spre...

Страница 3: ...Limited Warranty 3...

Страница 4: ...f hazards and safety precautions that need to be taken to avoid personal injury or death Always keep children away from bins and vehicles with flowing grain Make no unauthorized modifications to machi...

Страница 5: ...larly during operation Keep away from all moving parts Keep all shields in place SHUT OFF AND LOCK OUT all power before servicing Failure to follow precautions above could result in death or serious i...

Страница 6: ...during installation Decal 3 is mounted at factory Make sure location for decal is free from grease oil and dirt Remove backing from decal and place in proper position IMPORTANT If suggested locations...

Страница 7: ...To mount pan to spreader lower pitch adjusting rod by loosening locking handle and pre spread disc inside of cone Lower adjusting rod so its end is about 3 below main bearing shaft See Fig 2 One end o...

Страница 8: ...A 3 Bolt 5 16 18 x 1 PLT 18 J0527 4 Lock washer 5 16 PLT 18 J1200 5 Hex nut 5 16 18 18 J1002 6 Flat washer 5 16 18 J1111 Super Hi Capacity 1 Divide circumferences of center fill ring into three 3 equa...

Страница 9: ...onal vertical brackets if required If pre spread funnel is used use longer vertical brackets See table below If bin s fill ring is too small for Spredway to fit through use a winch to raise it from in...

Страница 10: ...lls in center of bin If grain is too high in center rotate cover to make opening smaller If grain is too low in center rotate cover to make opening larger Pre spread ring is designed to allow for mult...

Страница 11: ...vy duty wiring to Spredway motor Follow applicable electrical codes Operating voltages for Spredway motors are listed below MOTOR TYPE FACTORY PRE WIRED VOLTAGE ALTERNATIVE VOLTAGE 1 2hp 1ph 115 volts...

Страница 12: ...Parts Identification 12 PARTS IDENTIFICATION Standard and High Capacity Spredway Galvanized G01051...

Страница 13: ...Spread G0144 Motor 75hp 3ph 440V wired High Cap Wide Spread G0148 13 Pulley 1 3 4 x 5 8 Standard 1 J0290 14 Pulley 2 1 4 x 5 8 High Cap Wide Spread 1 J0299 15 Key 3 16 x 3 16 x 1 1 G0150 16 Bolt 5 16...

Страница 14: ...Parts Identification 14 Super High Capacity Spredway Galvanized G0250...

Страница 15: ...1 G0272 G0273 G0274 15 Spreader cone 1 G02921 16 Center bracket 3 G02922 17 Motor mount bracket 1 G02923 18 Pre spread ring Super High 1 G02924 19 Spreader pan Super High 2 G02991 20 1 center bearing...

Страница 16: ...phone _____________________________ Office phone ___________________________ Fax ___________________________________ In Case of Emergency Have emergency numbers and directions to your location near a...

Отзывы: